HOME  |  NEWS  |  BLOGS  |  MESSAGES  |  FEATURES  |  VIDEOS  |  WEBINARS  |  INDUSTRIES  |  FOCUS ON FUNDAMENTALS
  |  REGISTER  |  LOGIN  |  HELP
William K.
User Rank
Platinum
Re: The old system didn't have much thought...
William K.   6/25/2013 5:00:29 PM
NO RATINGS
My guess is that the original collection of test stands was created as each different type of helicopter was designed, probably by the first builders of each model. It often happens that way. And so there is a collection of test stands, each representing a different approach to different requirements and built over a span of many years. Designing a different stand to test all of the models with a different set of requirements is a great idea, but it is quite different from what the first projects were. And as system requirements change a lot, the original systems are not able to meet the new requirements. Not bad engineering, just "long ago and different specifications" engineering. Change will bury us if we aren't careful.

ChrisLake
User Rank
Iron
Re: Controls
ChrisLake   6/25/2013 11:42:27 AM
NO RATINGS
Thanks for the interest and question. RedViking has developed a test stand control and software platform called RedRaven that incorporates a supervisory host system, PLC based machine function and safety control, high performance drive control, and integrated high speed data acquisition. The manufacturers of the hardware can very but in this case we integrated Rockwell AB PLCs, NI data acquisition hardware, and Siemens drives and Motor. The host system, which includes the HMI software, is all custom LabVIEW code.

kf2qd
User Rank
Platinum
The old system didn't have much thought...
kf2qd   6/25/2013 9:37:36 AM
NO RATINGS
I would have thought that the old system would have, at the least , had test pallets where the device under test could have been loaded, off the test stand, and then put on the test stand and the test stand connections quickly made.

 

It sounds like the original stands were made to maximize cost at the expense of efficientcy.

far911
User Rank
Silver
Re: Controls
far911   6/25/2013 7:07:56 AM
NO RATINGS
The automation of such a gigantic mechanism seems like a strenuous task. Good job and thanks for the informative blog post. 

TJ McDermott
User Rank
Blogger
Controls
TJ McDermott   6/24/2013 10:46:50 PM
NO RATINGS
Mr. Lake, what industrial controls did you use for the flexible test stands?



Partner Zone
Latest Analysis
Perfection is a laudable, but ultimately unattainable, goal, even for the world's most successful consumer electronics company. You know the hits; here are Apple's all-time greatest misses.
Siemens' new version of Imagine Lab was designed to help the automotive and aerospace industries meet environmental mandates.
Belden and Secomea have developed a remote access system that gives users a plug-and-play connection to plant assets.
Here are some of the top-paying jobs available to engineers as they grow in their careers.
As manufacturers add new technologies to their products, designing for compliance becomes more difficult. Prepare for the certification testing process. Otherwise, you increase the risk of discovering a safety issue after a product leaves the assembly line. That will cause significant time-to-market delays, be much costlier to fix, and damage your brand in the eyes of customers. 
More:Blogs|News
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  6 |  7 | 8 | 9 | 10


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Technology Marketplace

Copyright © 2016 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service