HOME  |  NEWS  |  BLOGS  |  MESSAGES  |  FEATURES  |  VIDEOS  |  WEBINARS  |  INDUSTRIES  |  FOCUS ON FUNDAMENTALS
  |  REGISTER  |  LOGIN  |  HELP
Comments
View Comments: Newest First|Oldest First|Threaded View
Page 1/2  >  >>
Lisa hanawalts
User Rank
Iron
Resposibility of electrician!!
Lisa hanawalts   5/9/2014 3:02:05 AM
NO RATINGS
Electrical technicians have a big resposibity to be carefully solve electrical fault. Because electrical technical 's one mistake can lead to loss of property and life. I understand above problem how technical without knowing problem changes the fuse.

Cadman-LT
User Rank
Platinum
Re: Why???
Cadman-LT   7/16/2013 11:14:36 AM
NO RATINGS
And to think. I actually held repair technicians above most car mechanics. I guess it all depends on the person.

Cadman-LT
User Rank
Platinum
Re: Why???
Cadman-LT   7/16/2013 11:08:33 AM
NO RATINGS
Noswad...I think you got that right!!

Noswad
User Rank
Gold
Why???
Noswad   6/19/2013 4:04:43 PM
NO RATINGS
The repair technician had a nice and easy repair going that he could make a nice profit on and you went and screwed it up.

William K.
User Rank
Platinum
Re: Better solutions-
William K.   6/3/2013 9:39:18 PM
NO RATINGS
In aFender amp there are a few things that will make a fuse pop. A leaky filter cap will certainly cause a problem, as will a leaky cap across the cathode bias resistor. But the very nastiest ones are tose capacitors coupling to the output tube grids, because a leak there will also cause the tube life to be shorter by a large amount and possibly burn the output transformer, an item expensive to replace, if it can be found at any price. That is why I recommended replacing them with 600 volt units, or even 1000 volt caps. And the low leakage ones were the best choice.

tekochip
User Rank
Platinum
Re: Breaker Replacement
tekochip   6/3/2013 8:29:04 PM
NO RATINGS
It worked perfectly.  The replacement breaker was huge, but the spec was perfect.

William K.
User Rank
Platinum
Re: Breaker Replacement
William K.   6/3/2013 7:22:33 PM
NO RATINGS
So I am wondering if the replacement breaker worked out as intended? Or NOT?

tekochip
User Rank
Platinum
Re: Better solutions-
tekochip   6/3/2013 7:21:23 PM
NO RATINGS
 Being a huge Fender fan, I gotta ask, why in the world was the fuse blowing? The only one I ever took out was when my drummer knocked a Coke bottle off my amp and something akin to a Mentos fountain showered my 6L6s. The Coke shorted the plate to the filament, wiping out a 6L6, opening the hum balance control and burning the fuse. Fortunately there was a spare amp because it was the opening tune.


tekochip
User Rank
Platinum
Breaker Replacement
tekochip   6/3/2013 7:14:36 PM
NO RATINGS
I had a plasma TV that would frequently open its ill-sized, mini fuse. I was sure it was simply getting too hot in the fuse holder, so I replaced the fuse with a breaker that was carefully selected to have the same current and trip time specs.


ndjalva
User Rank
Iron
Re: Repairing laptop power supply
ndjalva   6/3/2013 4:51:18 PM
NO RATINGS
NEVER expect a service teck to know the answer, It was not on the page.......

I have nothing more to say.

Page 1/2  >  >>


Partner Zone
Latest Analysis
We searched far and wide for the top employers for engineers. These companies were ranked by engineering professionals, engineering students, and engineering instructors and professors. Does your employer make the grade?
Sherlock Ohms highlights stories told by engineers who have used their deductive reasoning and technical prowess to troubleshoot and solve the most perplexing engineering mysteries.
While every company might have their own solution for PLM, Aras Innovator 10 intends to make PLM easier for all company sizes through its customization. The program is also not resource intensive, which allows it to be appropriated for any use. Some have even linked it to the Raspberry Pi.
The demand for solar energy around the world will grow a total of 75% by 2019, according to a new report by Lux Research. Trade disputes and policy changes, though, will complicate the picture.
Using a 3D printer, CNC router, and existing powertrain components, a team of engineers is building an electric car from scratch on the floor of the International Manufacturing Technology Show in Chicago this week.
More:Blogs|News
Design News Webinar Series
9/10/2014 11:00 a.m. California / 2:00 p.m. New York
7/23/2014 11:00 a.m. California / 2:00 p.m. New York
7/17/2014 11:00 a.m. California / 2:00 p.m. New York
6/25/2014 11:00 a.m. California / 2:00 p.m. New York
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
Sep 22 - 26, MCU Software Development A Step-by-Step Guide (Using a Real Eval Board)
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  6


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Next Class: September 30 - October 2
Sponsored by Altera
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Sponsored Content

Technology Marketplace

Copyright © 2014 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service