HOME  |  NEWS  |  BLOGS  |  MESSAGES  |  FEATURES  |  VIDEOS  |  WEBINARS  |  INDUSTRIES  |  FOCUS ON FUNDAMENTALS
  |  REGISTER  |  LOGIN  |  HELP
Greg M. Jung
User Rank
Platinum
Effective Requirements
Greg M. Jung   11/4/2012 3:45:55 PM
NO RATINGS
Yes, I agree that defining effective requirements is key to a successful project launch.  With products and systems becoming more and more complex, it seems that the majority of my time is used to properly gather, define, adjust and trace project requirements.  I expect this trend to continue to grow as system complexity continues to increase.

Beth Stackpole
User Rank
Blogger
Re: PLM can play a role
Beth Stackpole   10/26/2012 7:27:42 AM
NO RATINGS
That scenario you describe, Naperlou, is definitely spot on with what I've continually heard from engineers and industry folk. Siloed, oftentimes, proprietary and custom-built systems that have little integration with the rest of the engineering tool suite. I think while the aerospace companies might still use their proprietary systems (afterall, they've made a huge investment), many other companies, including automotive makers, are branching out into the requirements traceability function as part of a broader PLM effort.

naperlou
User Rank
Blogger
Re: PLM can play a role
naperlou   10/25/2012 10:54:31 AM
NO RATINGS
Beth, you are correct.  Tools that pull in all requirements and information across the system can be a real differentiator.  I "grew up" in the aerospace industry (primarily space).  We put a lot of effort into requirements, traceability and testing, of course.  In the early days much of what we had was home grown.  The projects were big enough that this was not an issue.  After getting out into the commercial world, I was appaled at the lack of requirements traceability and the risky situations companies put themselves in when developing products. 

With the new standards mentioned by Jim in the article, it is no longer sufficient to handle requirements manually in many areas.  I recall a discussion on Embedded.com on certification of engineers in the areas mentioned being required at some point.  That is how critical software and requirements traceability is. 

Beth Stackpole
User Rank
Blogger
PLM can play a role
Beth Stackpole   10/25/2012 7:30:32 AM
NO RATINGS
With embedded systems an important part of all types of products, even mainstream consumer household goods, the software piece of development plays an increasingly important role so you are absolutely right that the entire development team needs to care--not just the software guys.

Unfortunately, automated requirements traceability and vertification of code, if practiced at all, is typically performed in a separate system that has little to no integration with the other primary engineering systems like PDM, CAD, and ECAD. Sensing the need and spying opportunity, most of the leading PLM vendors have made it a priority to change that scenario, either acquiring or building out requirements and traceability functionality as part of their integrated PLM suites.

 



Partner Zone
Latest Analysis
Check out these strange technology acquisitions. Many of these mergers became burdens the companies couldn't bear.
The Strati EV car printed at IMTS is made of SABIC's LNP STAT KON AE003. SABIC tells Design News why this carbon fiber-reinforced compound was chosen by Local Motors and Oak Ridge National Laboratories.
The 2014 Ig Nobel Prize in Physics was awarded to Dr. Kiyoshi Mabuchi and his team members for their work measuring the slipperiness of banana peels. Turns out they're slipperier with the yellow side up.
Many scientists have been working battery-free ways to power wearable electronics that can replace bulky battery packs, particularly through the use of energy-harvesting materials. Now a team of researchers in China have upped the game by developing a lightweight and flexible solar cell that can be woven into two-way energy-harvesting fabric.
Researchers in Canada have developed a chin strap that harvests energy from chewing and can potentially power a digital earplug that can provide both protection and communication capabilities.
More:Blogs|News
Design News Webinar Series
9/25/2014 11:00 a.m. California / 2:00 p.m. New York
9/10/2014 11:00 a.m. California / 2:00 p.m. New York
7/23/2014 11:00 a.m. California / 2:00 p.m. New York
10/7/2014 8:00 a.m. California / 11:00 a.m. New York
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
Oct 20 - 24, How to Design & Build an Embedded Web Server: An Embedded TCP/IP Tutorial
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  6


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Next Class: October 2
Sponsored by Altera
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Sponsored Content

Technology Marketplace

Copyright © 2014 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service