HOME  |  NEWS  |  BLOGS  |  MESSAGES  |  FEATURES  |  VIDEOS  |  WEBINARS  |  INDUSTRIES  |  FOCUS ON FUNDAMENTALS
  |  REGISTER  |  LOGIN  |  HELP
Comments
View Comments: Newest First|Oldest First|Threaded View
270mag
User Rank
Iron
Re: Record of Changel
270mag   5/6/2013 12:34:08 PM
NO RATINGS
Tool_maker, In a perfect world, we would document everything everytime, but it's not always practical. In a large organization, thourough documentation is necessary to handle the logistics of communication. In a small mom-and-pop shop, you can get away with a certain amount of "mental" documentation because direct communication with those who know the details is easier.

This can be taken to extremes on both sides of the continuum. I used to work for a huge multinational conglomerate. We documented ourselves to death, literally. It took seven signatures and half a day to get an ECO approved and documented. That's IF I walked it through myself. The normal lag was about two weeks.

On the other hand, if you lose your human capital who happens to be the sole keeper of odd knowledge for a given project, good luck making heads or tails of it.

You have to find that balance of productivity and proper documentation with which you are comfortable.

Tool_maker
User Rank
Platinum
Record of Changel
Tool_maker   9/13/2012 12:46:46 PM
NO RATINGS
This is all over my head so I am way out of my comfort zone here, so if this question does not make sense just consider the source. 99% of what I do is mechanical and when I complete a design and the device is built, it is subjected to a run-off, often with the customer present. If changes are made, the drawings get updated and the alteration is logged. That way if I run into a similar design, I have a record of what did not work and how we corrected it. Is that done in your field as well or would someone else have to go through the whole trouble shooting procedure you just spelled out?

One of my co-workers is so tunnel visioned that he thinks the only important thing is to make the device work. As a result, many alterations may occur with the only record being what he retains between his ears. It drives me crazy, but his family owns the company, so I deal with it.

Rob Spiegel
User Rank
Blogger
Re: Commitment
Rob Spiegel   9/4/2012 3:48:55 PM
NO RATINGS
Good point, Greg. These Sherlock Ohms stories are famous for showing how design engineers have to dispense with all assumptions and dig into areas that could easily get overlooked. If you have any of your own Sherlock stories, please send them along to: rob.spiegel@ubm.com

Greg M. Jung
User Rank
Platinum
Commitment
Greg M. Jung   9/1/2012 9:58:22 PM
NO RATINGS
I also like how you stayed on task and kept digging deeper and deeper until you fixed the root cause, rather than just put a patch on it. Good job and great commitment to quality.

notarboca
User Rank
Gold
Nice Fix
notarboca   8/31/2012 1:51:33 AM
NO RATINGS
Very nice fix; I like your troubleshooting methods and the way you tracked down the glitch.  Your example is a valuable lesson for embedded designers who almost always have to figure out concessions with I/O.



Partner Zone
Latest Analysis
Enabling the Future is designing prosthetic appendages modeled more like superhero arms and hands than your average static artificial limbs. And they’re doing it through a website and grassroots movement inspired by two men’s design and creation in 2012 of a metal prosthetic for a child in South Africa.
In order to keep an enterprise truly safe from hackers, cyber security has to go all the way down to the device level. Icon Labs is making the point that security has to be built into device components.
Senior Technical Editor Chuck Murray gets the skinny on Harting Inc.'s 3D MID technology, which allows users to create a three-dimensional circuit board out of molded plastic.
Three days after NASA's MAVEN probe reached Mars, India's Mangalyaan probe went into orbit around the red planet. India's first interplanetary mission, and the first successful Mars probe launched by an Asian nation, has a total project cost of nearly $600 million less than MAVEN's.
Siemens PLM Software has made an in-kind donation of software to Central Piedmont Community College in North Carolina for its science, technology, engineering, and mathematics (STEM) Division.
More:Blogs|News
Design News Webinar Series
9/25/2014 11:00 a.m. California / 2:00 p.m. New York
9/10/2014 11:00 a.m. California / 2:00 p.m. New York
7/23/2014 11:00 a.m. California / 2:00 p.m. New York
7/17/2014 11:00 a.m. California / 2:00 p.m. New York
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
Oct 20 - 24, How to Design & Build an Embedded Web Server: An Embedded TCP/IP Tutorial
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  6


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Next Class: September 30 - October 2
Sponsored by Altera
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Sponsored Content

Technology Marketplace

Copyright © 2014 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service