HOME  |  NEWS  |  BLOGS  |  MESSAGES  |  FEATURES  |  VIDEOS  |  WEBINARS  |  INDUSTRIES  |  FOCUS ON FUNDAMENTALS
  |  REGISTER  |  LOGIN  |  HELP
<<  <  Page 2/2
naperlou
User Rank
Blogger
Should have been done earlier
naperlou   8/27/2012 9:04:43 AM
NO RATINGS
When you talk about syncing electrical and mechanical design it makes me think about cars, and their wiring harnesses.  Of course, I don't do too much on my current cars.  They are too complex and I don't have all the diagnostic tools.  In the past, though, I had cars I could work on (actually take apart with basic tools) and I did.  What I noted was that the wiring was always problematic.  It was like an add-on, although it was essential.  If only they had these tools back then... (and then was a long time ago).

jan takke
User Rank
Iron
Syncing e- and m- design silos
jan takke   8/27/2012 6:50:26 AM
NO RATINGS
In fact this article triggered me to finally join this forum... The topic of integrating the e- and m-silo (but also s-oftware and o-ptics) has been part of my life for a long time. Talking about carradio-sets with built in cassette-recorders and limited space it was quite natural that placement of e-components would be synced with the drive-belt of the recorder competing for the same space. At the time (70's) the Computervision CAD system was our system of choice because it featured one integrated data-base for electrical and mechanical data. Conceived by genius and ruined by later managerial decisions to grow through aquisition with incompatible cie's, as a consequence of which the grand idea died and CV as well... pity and shame!
So hooray for SolidWorks to revive this ideal and make true collaboration and concurrent engineering possible accross classical silo-boundaries!

<<  <  Page 2/2


Partner Zone
Latest Analysis
We searched far and wide for the top employers for engineers. These companies were ranked by engineering professionals, engineering students, and engineering instructors and professors. Does your employer make the grade?
Sherlock Ohms highlights stories told by engineers who have used their deductive reasoning and technical prowess to troubleshoot and solve the most perplexing engineering mysteries.
While every company might have their own solution for PLM, Aras Innovator 10 intends to make PLM easier for all company sizes through its customization. The program is also not resource intensive, which allows it to be appropriated for any use. Some have even linked it to the Raspberry Pi.
The demand for solar energy around the world will grow a total of 75% by 2019, according to a new report by Lux Research. Trade disputes and policy changes, though, will complicate the picture.
Using a 3D printer, CNC router, and existing powertrain components, a team of engineers is building an electric car from scratch on the floor of the International Manufacturing Technology Show in Chicago this week.
More:Blogs|News
Design News Webinar Series
9/10/2014 11:00 a.m. California / 2:00 p.m. New York
7/23/2014 11:00 a.m. California / 2:00 p.m. New York
7/17/2014 11:00 a.m. California / 2:00 p.m. New York
6/25/2014 11:00 a.m. California / 2:00 p.m. New York
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
Sep 22 - 26, MCU Software Development A Step-by-Step Guide (Using a Real Eval Board)
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  6


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Next Class: September 30 - October 2
Sponsored by Altera
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Sponsored Content

Technology Marketplace

Copyright © 2014 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service