HOME  |  NEWS  |  BLOGS  |  MESSAGES  |  FEATURES  |  VIDEOS  |  WEBINARS  |  INDUSTRIES  |  FOCUS ON FUNDAMENTALS
  |  REGISTER  |  LOGIN  |  HELP
naperlou
User Rank
Blogger
Process cost
naperlou   8/6/2012 9:09:18 AM
NO RATINGS
This is an interesting example of a failure mode that is not going to be easy to predict.  It seems that, short of testing a sample of the parts after each process, one can only track the parts after production and remedy situations as they occur.  This requires a detailed tracking of the products after delivery and detailed reports of problems.  In general, quality control systems do this.  By linking those databases with design data in a PLM system, another big theme of Design News lately, one can avoid the problem in the future. 

TJ McDermott
User Rank
Blogger
Re: Process cost
TJ McDermott   8/6/2012 10:11:28 AM
NO RATINGS
Alternatively, it might mean derating the usable strength of the parts in order to eliminate the process cost.

Dave Palmer
User Rank
Platinum
Re: Process cost
Dave Palmer   8/6/2012 11:50:08 AM
NO RATINGS
@TJ McDermott: I would strongly recommend against derating hydrogen embrittled parts, if by derating you mean using the affected parts in a lower-stress application.  The problem is that it's extremely difficult to predict what level of stress a hydrogen-embrittled part will fail at.  Even residual stresses from the forming process may be enough to produce microcracks, which may propagate later in fatigue.  If I knew that a part was likely to be hydrogen embrittled, I wouldn't recommend using it in any application.

The same line of argument applies to baking parts as a re-work method after a problem has been found.  As I mentioned, it's important to bake parts as soon as possible after plating or welding.  Some aerospace specifications require that this be done within one hour.  The more time passes, the less effective baking will be.  This is not so much due to the hydrogen being any more difficult to remove (although you will hear this claim), so much as the fact that microcracks may have already formed as a result of residual stress.  Obviously, once cracks have formed, no amount of baking will heal them.

As naperlou pointed out, prevention of process-induced hydrogen embrittlement depends on having a good quality system in place.  If you're plating or welding high-strength parts, you need to ensure that they are always baked at the proper temperature within the specified length of time.

bdcst
User Rank
Platinum
Re: Process cost
bdcst   8/10/2012 12:17:43 PM
NO RATINGS
Well, hydrogen embrittlement is  a long known issue that has played havoc with metals at nuclear power plants and has lead to fuel rod cadding failures along with reduction of the rating of some containment vessels.

tekochip
User Rank
Platinum
Great Story
tekochip   8/6/2012 10:44:58 AM
NO RATINGS
Great story, that's an obscure and dangerous failure mode.


Tomv
User Rank
Iron
In process control mandatory
Tomv   1/29/2014 9:52:41 AM
NO RATINGS
Derating is not a good option for dealing with hydrigen embrittlement due to the unpredictability of potnetial failure.  The problem must be controlled/eliminted in process.  I know of circumstance in which a critical flight control component fialed due to hydrogen embrittlement under strictly vibratory loading - no compression or tensile load at all.  Reuslt was the death of a number of individuals.



Partner Zone
Latest Analysis
If you didn't realize that PowerPoint presentations are inherently hilarious, you have to see Don McMillan take one apart. McMillan -- aka the Technically Funny Comic -- worked for 10 years as an engineer before he switched to stand-up comedy.
The first Tacoma Narrows Bridge was a Washington State suspension bridge that opened in 1940 and spanned the Tacoma Narrows strait of Puget Sound between Tacoma and the Kitsap Peninsula. It opened to traffic on July 1, 1940, and dramatically collapsed into Puget Sound on November 7, just four months after it opened.
Noting that we now live in an era of “confusion and ill-conceived stuff,” Ammunition design studio founder Robert Brunner, speaking at Gigaom Roadmap, said that by adding connectivity to everything and its mother, we aren't necessarily doing ourselves any favors, with many ‘things’ just fine in their unconnected state.
When my daughter decided she wanted to study engineering, I was very proud of her. At the same time, in the back of my mind, I wondered if she knew what she was in for.
AutoDesk has teamed up with 3D scanner provider Artec to link CAD software and 3D scanners to make it faster and easier to create accurate 3D mesh models for printing or digital use.
More:Blogs|News
Design News Webinar Series
11/19/2014 11:00 a.m. California / 2:00 p.m. New York
11/6/2014 11:00 a.m. California / 2:00 p.m. New York
10/7/2014 8:00 a.m. California / 11:00 a.m. New York
12/11/2014 8:00 a.m. California / 11:00 a.m. New York
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
Dec 1 - 5, An Introduction to Embedded Software Architecture and Design
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  6


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Last Archived Class
Sponsored by Littelfuse
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Sponsored Content

Technology Marketplace

Copyright © 2014 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service