Wow, sounds like a lot of hardship could be avoided by a conference between Ladder I and Ladder II as to coordinating build orders. Sort of reminds me of "how spec'd vs. how built".
Agreed. It also sounds like there could be more automation in the coordination of the "Ladders". Another alternative is to tag each assembly so that the stations can get the data from a central repository.
The coordination was in the build order documents. Each van was listed in order, and from Ladder I, through all of the Body Shop, Paint Shop, and Final Assembly, the build order document was the 'bible'. The problems happened when the 'bible' was not followed exactly. The spacing between frames was about 90 seconds. It took about 150 seconds for a crew to build a frame in Ladder I, so there were 2 build crews. If those 2 crews got out of sequence, either by skipping a frame or building a duplicate, problems happened. It was easy to spot a long frame / short floor or short frame / long floor mismatch, but others were not so easy.
It is interesting to see that the engineer came to you with the question about the robots. The engineer seemed to only pull some data from a server and did no real root cause analysis. Data is not always the only answer.
Tim; My experience with robots is that the robot is usually blamed first for any problem. Since I was usually the robot tech, I had to find the real problem, which usually was not the robot. It was not unusual for a problem investigation to be cursory, and stop at blaming the robot.
"The engineer presented the numbers to me, and wanted to know what was wrong with the robots that they had so many servo errors, and what needed to be done to fix the problem."
The numbers the engineer presented should have included the number of times the crash was related to an incorrect bracket having been present... Ya think? At which point that becomes the issue.
And my experience with robots has given me this as a starting point as to their 'intelligence'... they are as dumb as a box of rocks.
Where a human would side-step the inconsistent configuration 99% of the time; the robot will crash into it 100% of the time.
So when a human puts on the wrong bracket and the robot trips over it... no surprise.
As much as possible sensors/identifiers could help. Idiot proofing applies to robotic assembly lines just as it does to human assembly lines. It depends how much you want to spend to achieve zero-error production.
We do a lot of fixturing that restricts against incorrect assembly, and some of our assemblies lines have vision, bar code scans, or checklists to keep both the robots and the humans on track... i.e. if they had scanned the brackets as they were applied, and that info when into that frames live tracking info...
So the process "allow" human error to create robot error.
The lesson learned, but the fix is not discussed. Can we assume a better computer tracking regimen was implemented?
Ralphy Boy; The part tracking was not changed. The 'G' van was phased out about 2 years later, so no significant process improvements were planned or implemented.
One of the reasons that robotic automation improves quality, is robots will not work with 'junk'. A human welder can adjust the fit of a bad part and then weld the assembly. The robot welds where the part was supposed to be, and the assembly then fails.
"The cross rails were different according to the gasoline tank size. If the cross rails installed did not match the build data, the selected robot path could crash the spot welding gun into the cross rails."
Actually when I said crash I was thinking of this. I'm not sure about the robots on the GM line but ours don't always do well recovering from a crash...
We do that assembly line sharing stuff at times too... When a multiple use line is running, maintaining a clean separation between the small stuff, like optionals can be tough. I am not saying we do it perfectly, but we do strive to learn and improve. ; )
And I get what you're saying about quality. Robots are amazing at repeating the same process over and over in a very precise way (fast too the little buggers).
Sounds like this plant needed to tag/code every sub-part as it was made so that the next station could read that tag and confirm tha the correct pieces were in place before beginning the next step in the welding process. A bar code tag in a known spot on every piece that would have to be read before the welding operation could be started. Could easil be done as the assembly was being moved into the first welding station. Make sure the correct parts are in place before slamming the robot into things and slowing down the process.
Hopefully thy did something like that on the next version of the line. Would really speed things up because there would be a record of the wrong parts being placed on the line, and the corresponding effort to ruduce the human errors and improve quality.
kf2qd; The Scarborough Van Plant built the 'G' van until 1993. Then the equipment was dismantled and moved to Flint Michigan. I think the 'G' van was discontinued entirely in 1995. The Scarborough plant had painting robots in the Paint Shop, and welding robots in the Body Shop - CarTrac. The rest of the plant was primarily manual assembly operations.
Every part had a part number, but that number was on the box or bin of many individual unlabeled parts. The parts were manually selected and positioned for assembly, and initially manually welded. The robots then welded the assembled frame to the assembled floor. The build information was in the PLC and was shifted to the welding stations as the carrier advanced into the station. There was no inspection capability to automatically identify the assembly to verify the manually selected parts.
@kfqd: I have never worked in the sort of environment described so this question may be silly. If the operator can manually select the wrong part, is it not possible that another operator could apply the wrong tag/code?
Tool_maker; I'm guessing you mean a tag applied to the part. For most of the parts, the part itself was not individually identified by a tag or code. Only the bin or box containing the parts had an identifying code.
There were several cross rails, and it could be a case of two cross rails in the wrong sequence - the parts were correct, but in swapped locations. In other cases it could be an extra, unnecessary part added.
When the operator at the station where the frame was mated to the floor identified an actual build vs. build data mismatch, an electrician could edit the PLC bit data to correct the build data in the PLC.
By refining topologies and using new fluid technology, Moog's new peak sine drive controller increases available power without increasing controller volume.
Lantronix Inc. has expanded its line of controllers for sensor networks with the release of a rugged controller that improves management of automation systems used in a number of industries, including manufacturing, oil and gas, and chemicals.
Inspired by the hooks a parasitic worm uses to penetrate its host's intestines, the Karp Lab has invented a flexible adhesive patch covered with microneedles that adheres well to wet, soft tissues, but doesn't cause damage when removed.
From Dell / Intel® New Paradigms in Design Work Scott Hamilton, vertical market strategist for Dell Precision workstations, 5/2/2013 3
Early in my career, I worked as a draftsman and remember the days of drawing on vellum with numbered pencils and Mylar with plastic lead. This was a fun experience in the sense that I ...
I've been using workstations for more than 10 years and love finding ways to get more performance from my system. With demanding professional applications that require more power each ...
A lasting memory from my first job as an engineer in an auto assembly plant is standing on hard concrete at six in the morning, vending-machine coffee clutched in hand, listening to ...
A quick look into the merger of two powerhouse 3D printing OEMs and the new leader in rapid prototyping solutions, Stratasys. The industrial revolution is now led by 3D printing and engineers are given the opportunity to fully maximize their design capabilities, reduce their time-to-market and functionally test prototypes cheaper, faster and easier. Bruce Bradshaw, Director of Marketing in North America, will explore the large product offering and variety of materials that will help CAD designers articulate their product design with actual, physical prototypes. This broadcast will dive deep into technical information including application specific stories from real world customers and their experiences with 3D printing. 3D Printing is
To save this item to your list of favorite Design News content so you can find it later in your Profile page, click the "Save It" button next to the item.
If you found this interesting or useful, please use the links to the services below to share it with other readers. You will need a free account with each service to share an item via that service.