HOME  |  NEWS  |  BLOGS  |  MESSAGES  |  FEATURES  |  VIDEOS  |  WEBINARS  |  INDUSTRIES  |  FOCUS ON FUNDAMENTALS
  |  REGISTER  |  LOGIN  |  HELP
Comments
View Comments: Newest First|Oldest First|Threaded View
<<  <  Page 2/2
Tim
User Rank
Platinum
Data
Tim   7/31/2012 9:44:19 PM
NO RATINGS
It is interesting to see that the engineer came to you with the question about the robots. The engineer seemed to only pull some data from a server and did no real root cause analysis. Data is not always the only answer.

GlennA
User Rank
Gold
Re: Engineering communication
GlennA   7/31/2012 9:33:36 AM
NO RATINGS
The coordination was in the build order documents.  Each van was listed in order, and from Ladder I, through all of the Body Shop, Paint Shop, and Final Assembly, the build order document was the 'bible'.  The problems happened when the 'bible' was not followed exactly.  The spacing between frames was about 90 seconds.  It took about 150 seconds for a crew to build a frame in Ladder I, so there were 2 build crews.  If those 2 crews got out of sequence, either by skipping a frame or building a duplicate, problems happened.  It was easy to spot a long frame / short floor or short frame / long floor mismatch, but others were not so easy.

naperlou
User Rank
Blogger
Re: Engineering communication
naperlou   7/31/2012 8:58:26 AM
NO RATINGS
Agreed.  It also sounds like there could be more automation in the coordination of the "Ladders".  Another alternative is to tag each assembly so that the stations can get the data from a central repository.

notarboca
User Rank
Gold
Engineering communication
notarboca   7/31/2012 8:47:54 AM
NO RATINGS
Wow, sounds like a lot of hardship could be avoided by a conference between Ladder I and Ladder II as to coordinating build orders.  Sort of reminds me of "how spec'd vs. how built".

<<  <  Page 2/2


Partner Zone
Latest Analysis
Technology has proven over and over again to be tremendously empowering, to individuals and organizations alike. Misuse that power, however, and you might find yourself in big trouble.
Steadfast in its belief that diesel engines are right for the times, General Motors is expanding US availability of the compression-ignited technology in Chevrolet cars and light trucks.
Most cyber attacks could be avoided by adopting a list of Critical Security Controls that were created by the Center for Internet Security. That’s the message from Steve Mustard of the Automation Federation.
How 3D printing fits into the digital thread, and the relationship between its uses for prototyping and for manufacturing, was the subject of a talk by Proto Labs' Rich Baker at last week's Design & Manufacturing Minneapolis.
The term “range anxiety” began fading into the rear view mirror recently, as major automakers made announcements about longer-range, battery-powered cars.
More:Blogs|News
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
Sep 12 - 16, Analytics for the IoT: A Deep Dive into Algorithms
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  6 |  7 | 8 | 9 | 10


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Technology Marketplace

Copyright © 2016 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service