HOME  |  NEWS  |  BLOGS  |  MESSAGES  |  FEATURES  |  VIDEOS  |  WEBINARS  |  INDUSTRIES  |  FOCUS ON FUNDAMENTALS
  |  REGISTER  |  LOGIN  |  HELP
Comments
View Comments: Newest First|Oldest First|Threaded View
<<  <  Page 2/2
Tim
User Rank
Platinum
Data
Tim   7/31/2012 9:44:19 PM
NO RATINGS
It is interesting to see that the engineer came to you with the question about the robots. The engineer seemed to only pull some data from a server and did no real root cause analysis. Data is not always the only answer.

GlennA
User Rank
Gold
Re: Engineering communication
GlennA   7/31/2012 9:33:36 AM
NO RATINGS
The coordination was in the build order documents.  Each van was listed in order, and from Ladder I, through all of the Body Shop, Paint Shop, and Final Assembly, the build order document was the 'bible'.  The problems happened when the 'bible' was not followed exactly.  The spacing between frames was about 90 seconds.  It took about 150 seconds for a crew to build a frame in Ladder I, so there were 2 build crews.  If those 2 crews got out of sequence, either by skipping a frame or building a duplicate, problems happened.  It was easy to spot a long frame / short floor or short frame / long floor mismatch, but others were not so easy.

naperlou
User Rank
Blogger
Re: Engineering communication
naperlou   7/31/2012 8:58:26 AM
NO RATINGS
Agreed.  It also sounds like there could be more automation in the coordination of the "Ladders".  Another alternative is to tag each assembly so that the stations can get the data from a central repository.

notarboca
User Rank
Gold
Engineering communication
notarboca   7/31/2012 8:47:54 AM
NO RATINGS
Wow, sounds like a lot of hardship could be avoided by a conference between Ladder I and Ladder II as to coordinating build orders.  Sort of reminds me of "how spec'd vs. how built".

<<  <  Page 2/2


Partner Zone
Latest Analysis
From wearables to design changes to rumors of a car, Apple has multiple things cooking up in its kitchen. Here are six possibilities from Apple next week, with likely more than one coming to light.
The key to the success of alt energy is advanced automation, which is still relatively new to the energy scene.
Sherlock Ohms highlights stories told by engineers who have used their deductive reasoning and technical prowess to troubleshoot and solve the most perplexing engineering mysteries.
New fastening and joining methods are making it possible to join multiple materials and thinner sheets in consumer and medical portable electronics, as well as automotive and aviation systems.
An upcoming Digi-Key Continuing Education Center class on designing motor control using MCUs and FPGAs will show you how to choose the best hardware and tools to speed up your development time.
More:Blogs|News
Design News Webinar Series
2/25/2015 11:00 a.m. California / 2:00 p.m. New York
12/11/2014 8:00 a.m. California / 11:00 a.m. New York
12/10/2014 8:00 a.m. California / 11:00 a.m. New York
11/19/2014 11:00 a.m. California / 2:00 p.m. New York
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
Mar 9 - 13, Implementing Motor Control Designs with MCUs and FPGAs: An Introduction and Update
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  67


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Sponsored Content

Technology Marketplace

Copyright © 2015 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service