HOME  |  NEWS  |  BLOGS  |  MESSAGES  |  FEATURES  |  VIDEOS  |  WEBINARS  |  INDUSTRIES  |  FOCUS ON FUNDAMENTALS
  |  REGISTER  |  LOGIN  |  HELP
<<  <  Page 3/3
Mydesign
User Rank
Platinum
Re: Energy Storage Could Make Electric Trains More Efficient
Mydesign   7/6/2012 2:07:54 AM
NO RATINGS
1 saves
Warren, am totally agreeing to your concept. It's the time to think about energy conservation, regeneration and exploring natural energy sources. Even am thinking further about generating energy, while train runs through the track.

Mydesign
User Rank
Platinum
Re-generation of Energy
Mydesign   7/6/2012 2:03:16 AM
NO RATINGS
1 saves
"An energy storage project in Philadelphia promises to capture braking energy and provide a voltage boost for electric trains"

Charles, what would be the amplitude of this barking energy. Since most of the components in braking systems are electro-hydraulic components, I feel that only a little amount of energy can be regenerate in normal course (Am not sure). But anyway regeneration or reusing the energy is the best part.

TJ McDermott
User Rank
Blogger
Portable
TJ McDermott   7/6/2012 12:26:50 AM
NO RATINGS
The image shows what looks like a somewhat standard shipping container.  Portable, 1.5 MW containers of power.  What could you do with that?

Charles Murray
User Rank
Blogger
Re: Metrics
Charles Murray   7/5/2012 8:43:19 PM
NO RATINGS
To some degree, they are in unexplored territory here, tekochip. Although regenerative braking and power assist have been done, the concept of piggybacking frequency regulation on top of regenerative braking in an application like this is new. Over time, the pilot will tell them more about the ROI.

warren@fourward.com
User Rank
Platinum
Energy Storage Could Make Electric Trains More Efficient
warren@fourward.com   7/5/2012 6:53:56 PM
NO RATINGS
Now we're talking!  What a great practical use of wasted energy.  Especially when going down hill with megatons of load!  I hope there is a future for this energy and it doesn't continue to go to waste. 

Now, how can we do the same with other big systems on a large scale?  The problem is, I can't think of anything to compare with trains.  They are unique in this way.  Good luck to Saft.

Jerry dycus
User Rank
Gold
Re: Metrics
Jerry dycus   7/5/2012 4:39:36 PM
NO RATINGS
 

  The ROI  and EROI isn't going to be good with this system, battery though using lead or molten salt might be cost effective near stations.

GE is currently doing a molten salt hybrid train Loco  that would be a better way.

The only reason the voltage might go too high is high resistance in the 3rd rail not able to pass the power along and train operators slowing the train too fast.  Training the engineers would be more cost effective eliminating the problem.

In the Rockies trains were scheduled so when one was going down it's energy was used to run another up the mountain.  They stopped that back when oil got so cheap.

 

naperlou
User Rank
Blogger
Intelligent storage
naperlou   7/5/2012 2:20:16 PM
NO RATINGS
This is a great use of technology to enhance efficiency.  It seems like a trend.  Large diesel locomotives have begun using hybrid technology as well.  Similar to this idea, they capture energy generated during breaking to provide low latency energy for acceleration.  Thus, the diesel engines can be used more efficiently. 

As Beth asks, I wonder how much this costs.  Of course, the real metric is the cost to benefit ratio.  Even a costly battery is worth it if it saves money on electricity from the utility.

tekochip
User Rank
Platinum
Metrics
tekochip   7/5/2012 2:12:06 PM
It would be nice to see some numbers on how much energy could be saved and what they believe the ROI time would be.

ttemple
User Rank
Platinum
Why not manage schedules?
ttemple   7/5/2012 8:43:35 AM
NO RATINGS
It looks like the energy could be managed by controlling who is starting and who is stopping, who is going up hills and who is going down hills, etc.  I didn't realize that they ever dumped energy.  I just figured things balanced out as some trains were stopping or going down hill while others were starting or going up hill, etc.  You would think that an intelligent scheduler could manage things such that energy storage was not needed.

I would think it would only take slight timing changes to keep the loads balanced to where you wouldn't have to dump energy, or store it.

Beth Stackpole
User Rank
Blogger
High visibility, high utility
Beth Stackpole   7/5/2012 7:45:21 AM
NO RATINGS
Wow. Very cool idea and great application of energy storage technology. Also a great test case for other cities and rail systems. My big question is who is paying for this pilot? It's got to be very expensive and with funding so tight for infrastructure-type projects across the country, I'm assuming this owned by the private sector. What's the likelihood that something like this has legs for being applied to other rail systems?

<<  <  Page 3/3


Partner Zone
Latest Analysis
A Silicon Valley company has made the biggest splash yet in the high-performance end of the electric car market, announcing an EV that zips from 0 to 60 mph in 3.4 seconds and costs $529,000.
The biggest robot swarm to date is made of 1,000 Kilobots, which can follow simple rules to autonomously assemble into predetermined shapes. Hardware and software are open-source.
The Smart Emergency Response System capitalizes on the latest advancements in cyber-physical systems to connect autonomous aircraft and ground vehicles, rescue dogs, robots, and a high-performance computing mission control center into a realistic vision.
Tolomatic ERD actuator provides high-tolerance, high-force capabilities at a low cost to innovative medical therapy machine.
The diesel engine, long popular on European roads, is now piquing the interest of American automakers.
More:Blogs|News
Design News Webinar Series
7/23/2014 11:00 a.m. California / 2:00 p.m. New York
7/17/2014 11:00 a.m. California / 2:00 p.m. New York
6/25/2014 11:00 a.m. California / 2:00 p.m. New York
5/13/2014 10:00 a.m. California / 1:00 p.m. New York / 6:00 p.m. London
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
Sep 8 - 12, Get Ready for the New Internet: IPv6
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  6


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Next Class: September 30 - October 2
Sponsored by Altera
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Sponsored Content

Technology Marketplace

Copyright © 2014 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service