HOME  |  NEWS  |  BLOGS  |  MESSAGES  |  FEATURES  |  VIDEOS  |  WEBINARS  |  INDUSTRIES  |  FOCUS ON FUNDAMENTALS
REGISTER   |   LOGIN   |   HELP
Comments
View Comments: Newest First|Oldest First|Threaded View
Jon Titus
User Rank
Blogger
Re: Reference also important
Jon Titus   6/20/2012 1:30:40 PM
NO RATINGS
Thanks for information about the ADC reference.  I had always thought the current draw was constant.

Walt
User Rank
Gold
Reference also important
Walt   6/20/2012 1:14:33 PM
NO RATINGS
Yes, this subject becomes even more important when you are sampling from an analog multiplexer.  Then the multiplexer output must settle before the sample is taken, which must also settle. :-)

Another similar important note is at the ADC reference.  Like the input itself, some ADCs draw small surge currents from the reference, so a well thought out capacitance at the reference and a low impedance reference voltage source may reduce complications (and confusion) when figuring out settling time.

Nancy Golden
User Rank
Platinum
Re: Great Topic!
Nancy Golden   6/19/2012 6:33:33 PM
NO RATINGS
I think that is where experience comes into play, Jon - and why it is so important for junior engineers to learn from senior engineers. I am forever grateful for the engineers that took the time to teach me real world things that you don't necessarily learn (or remember) from school - including settling times!

Jon Titus
User Rank
Blogger
Re: Great Topic!
Jon Titus   6/19/2012 6:00:13 PM
NO RATINGS
Thanks, Nancy.  Often we overlook details that later cause problems.  I know of several cases in which not accounting for settline time caused erroneous measurements.  Thankfully the people involved discovered the problem.

Nancy Golden
User Rank
Platinum
Great Topic!
Nancy Golden   6/19/2012 3:06:22 PM
NO RATINGS

Great article, Jon – thanks so much for sharing on a sometimes overlooked but extremely important part of taking accurate measurements. Settling times should be taken into account and I think how that is best handled depends on the circuitry, what is being measured and what is being used to take the measurements. On test sets we would keep cables as short as possible and in the old days we would simple do that through software by trial and error to come up with a reliable software delay (scary I know!) However, with the systems we were working on we were mostly taking DC measurements that were extremely repeatable so it worked out okay. I really appreciate the variety of solutions you offered – with the complexity of today's designs they offer great solutions and makes me want to go experiment!





Partner Zone
Latest Analysis
The National Highway Traffic Safety Administrationís recent backup camera mandate could open the door to more vehicle innovations, including better graphical displays, 360-degree camera views, and the increased use of Ethernet.
With support from National Instruments, a group of dedicated students from Connally High School in Austin, where more than 50% of the students are at risk of not graduating, have created a successful robotics team that is competing in the FIRST World Championships.
Solar Impulse 2 -- a 100% solar-powered airplane -- has been completed. It features several advanced materials, some developed specifically for next year's attempted around-the-world flight.
Sherlock Ohms highlights stories told by engineers who have used their deductive reasoning and technical prowess to troubleshoot and solve the most perplexing engineering mysteries.
Lumus and eyeSight have partnered to create consumer-grade devices that offer all the prime functions of smart glasses without the bulk.
More:Blogs|News
Design News Webinar Series
3/27/2014 11:00 a.m. California / 2:00 p.m. New York / 7:00 p.m. London
2/27/2014 11:00 a.m. California / 2:00 p.m. New York / 7:00 p.m. London
12/18/2013 Available On Demand
11/20/2013 Available On Demand
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
Apr 21 - 25, Creating & Testing Your First RTOS Application Using MQX
SEMESTERS: 1  |  2  |  3  |  4  |  5


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Next Class: April 29 - Day 1
Sponsored by maxon precision motors
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Sponsored Content

Technology Marketplace

Datasheets.com Parts Search

185 million searchable parts
(please enter a part number or hit search to begin)
Copyright © 2014 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service