SURPRISED
bobjengr   6/9/2012 11:52:34 AM
NO RATINGS

I can certainly agree with tekochip on this one.  It would seem logical to test the entire installation over a period of days to ensure proper operation of all systems prior to going "live".  Then again, I've been there.  Management sometimes does not allow time for a complete "shake-down" and we end up bench testing complementary systems instead of testing the entire assembly.   This is one of the great frustrations design engineering types have with right-to-left program management.

bobjengr
User Rank
Platinum
SURPRISED
bobjengr   6/9/2012 11:23:41 AM
NO RATINGS

I can certainly agree with tekochip on this one.  It would seem logical to test the entire installation over a period of days to ensure proper operation of all systems prior to going "live".  Then again, I've been there.  Management sometimes does not allow time for a complete "shake-down" and we end up bench testing complementary systems instead of testing the entire assembly.   This is one of the great frustrations design engineering types have with right-to-left program management.

akili
User Rank
Iron
Re: Broken down satellite tracker.
akili   6/6/2012 11:34:34 AM
NO RATINGS
You are right William K.  With the benefit of 20/20 hindsight, a lot of the technology on the early earth stations was overkill on a grand scale.  However, we had only just progressed from low orbit fast-moving satellites to synchronous satellites and many of the operators wanted to be able to track fast-moving satellites too, "just in case".  But I take issue over operating for "months".  As satellite technology improved and smaller dishes (5 to 7 metres) came into use they were often driven by bought-in electric actuators with so-called "sealed for life" lubrication.  This would be fine if they were operated at reasonable speed and over their whole travel to keep the lube grease distributed.  In fact they would operate for months just inching to and fro over only a small distance which then became dry and very worn and the unused leadscrew deteriorated.  Then when you wanted to move to another location it would sieze up and break the shear-pin and require complete overhaul or even replacement.  That was particularly a problem on the Caribbean islands with corrosive salty atmosphere that defied all but the very highest levels of IP rating.

William K.
User Rank
Platinum
Broken down satellite tracker.
William K.   6/5/2012 6:17:06 PM
NO RATINGS
This is a case of the unintended consequences of somthing that seemed like a good idea at the time. Shutting down the tracking system instead of sending an alarm message seemed like a good thing, although the leadscrew and gears could hgave lived for months without the lubrication spray. But somebody thought that it was more important to shut down the auto-tracking to preserve the gears.  Of course, if the protocol had been adequately documented the solution would have been clear much sooner.

ChasChas
User Rank
Platinum
slow wear and tear and sneak-up problems
ChasChas   6/5/2012 12:12:10 PM
NO RATINGS
 

These kind of problems are the most challanging - especially since the equipment can't be shut down at will.

akili
User Rank
Iron
Re: Surprised
akili   6/5/2012 10:51:28 AM
NO RATINGS
Now you have put your finger on the root of the problem!  The gearboxes and lubrication systems had been supplied and installed by a sub-contractor and the only "official" interface to our control system was the oil pressure signal.  The timeswitch didn't appear on any of our system diagrams and was fed from a spur from the antenna domestic mains, installed on an ad hoc basis by a sub-contract "sparks" at the request of the gearbox supplier.  That's how it got as far as it did - we were as surprised as anyone else when we found it.  Later earth-stations projects paid much more attention to such integration issues and consequently the commissioning threw up fewer and fewer surprises.  We still had some nasty experiences though, one in particular from an air-conditioning system.  But that's another story...

Mydesign
User Rank
Platinum
Re: Surprised
Mydesign   6/5/2012 3:20:13 AM
NO RATINGS
1 saves
Tekochip, it seems that integration testing had not happened. By component wise all the devices or parts may work fine and by integration testing we can find how the system is behaving in a complex atmosphere or in collaborative mode.

Mydesign
User Rank
Platinum
Rocket science
Mydesign   6/5/2012 3:17:07 AM
NO RATINGS
1 saves
Rod, we had a similar experience while working with the rocket launch division. During the testing phase, when time counter is incremented from 23.59 to 00.00, the vernier engines stops fueling the booster rockets and hence there is change in thrust pressure. We had done all sort of testing to find out why this fuel injection missing happens at that particular time and finally found that a small bug in the Micro controller program. According to the program 00.00 is the resetting cycle, so whenever the clock reaches 00.00, it reads as a reset instruction.

tekochip
User Rank
Platinum
Surprised
tekochip   6/4/2012 5:14:41 PM
NO RATINGS
I'm surprised this wasn't discovered during testing of the lubrication system.  It's not intermittent, and there wasn't anything odd about 11:30, it's just that the lubrication system caused the machine to fail.  It makes me think that the lubrication system was tested outside of the machine, or when it was at idle.

akili
User Rank
Iron
Re: alarm or fault memory
akili   6/4/2012 1:30:46 PM
NO RATINGS
You have to remember that this was around 1968 and control system design was moving from traditional relay technology to use of early (and expensive!) integrated circuits.  It just wasn't possible to latch every one of the hundreds of possible fault conditions and with hindsight, use of hard-wired printed circuit logic with IC's (mostly 7400 family in flat-packs) was smaller but no better than the relay version.  Only with the arrival of the microprocessor and true Programmable Logic Controller or PLC would all this be resolved sensibly.

Page 1/2  >  >>


Partner Zone
Latest Analysis
Advertised as the "Most Powerful Tablet Under $100," the Kindle Fire HD 6 was too tempting for the team at iFixit to pass up. Join us to find out if inexpensive means cheap, irreparable, or just down right economical. It's teardown time!
The first photos made with a 3D-printed telescope are here and they're not as fuzzy as you might expect. A team from the University of Sheffield beat NASA to the goal. The photos of the Moon were made with a reflecting telescope that cost the research team 100 to make (about $161 US).
At Medical Design & Manufacturing Midwest, Joe Wascow told Design News how Optimal Design prototyped a machine that captures the wing-beat of a duck.
The increased adoption of wireless technology for mission-critical applications has revved up the global market for dynamic electronic general purpose (GP) test equipment. As the link between cloud networks and devices -- smartphones, tablets, and notebooks -- results in more complex devices under test, the demand for radio frequency test equipment is starting to intensify.
Much of the research on lithium-ion batteries is focused on how to make the batteries charge more quickly and last longer than they currently do, work that would significantly improve the experience of mobile device users, as well EV and hybrid car drivers. Researchers in Singapore have come up with what seems like the best solution so far -- a battery that can recharge itself in mere minutes and has a potential lifespan of 20 years.
More:Blogs|News
Design News Webinar Series
10/7/2014 8:00 a.m. California / 11:00 a.m. New York
9/25/2014 11:00 a.m. California / 2:00 p.m. New York
9/10/2014 11:00 a.m. California / 2:00 p.m. New York
7/23/2014 11:00 a.m. California / 2:00 p.m. New York
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
Oct 20 - 24, How to Design & Build an Embedded Web Server: An Embedded TCP/IP Tutorial
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  6


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Next Class: 10/28-10/30 11:00 AM
Sponsored by Stratasys
Next Class: 10/28-10/30 2:00 PM
Sponsored by Gates Corporation
Next Class: 11/11-11/13 2:00 PM
Sponsored by Littelfuse
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Sponsored Content

Technology Marketplace

Copyright © 2014 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service