Scott Orlosky   5/19/2012 5:40:46 PM
NO RATINGS
Interesting to see how supply chains hold up to stress, no doubt about it.  As they say, if you're going to put all of your eggs in one basket - then watch that basket!  It begs the question as to whether the problem is a supply chain without any breadth of suppliers, or a supply chain in which the suppliers have too much risk.  I haven't heard anything about the results of the investigation into the fire in the first place, which might be where the tru problem lies.

Ann R. Thryft
User Rank
Blogger
Re: Supply chain risks
Ann R. Thryft   5/16/2012 5:52:00 PM
NO RATINGS
TJ, thanks for that comment. I was surprised to learn what a big market share Evonik had, and therefore what a big effect it could have when its plant went offline. I suspect the picture will look pretty different in the next few months.

Ann R. Thryft
User Rank
Blogger
Re: Timely topic
Ann R. Thryft   5/16/2012 5:49:22 PM
NO RATINGS
Thanks, Dave. Like I said, I've seen no mention of EPA requirements. Those could be part of the 5,000 hours of testing, or it might be something already done separately by the materials producers to meet their own automotive standards, since I doubt EPA approval could be achieved in the 3-4 week compressed schedules.

Dave Palmer
User Rank
Platinum
Re: Timely topic
Dave Palmer   5/16/2012 2:13:21 PM
NO RATINGS
@Ann: Yes, I'm refering to multilayer tubing used for fuel lines.  The EPA has regulations regarding evaporative emissions for both automotive and non-automotive applications.  Hydrocarbons can permeate through plastic tubing and escape into the atmosphere.  It's important to limit this. (This is what our barrier layer does).

I'm not sure what the automotive requirement is, but the marine requirement is 15 grams per square meter per day maximum.  This is measured according to one of two SAE standards, depending on whether it is plastic or rubber hose.  However, since I'm not directly involved in regulatory compliance, I'm not sure exactly how this needs to be documented to EPA, or what the approval process is.

Ann R. Thryft
User Rank
Blogger
Re: Timely topic
Ann R. Thryft   5/16/2012 1:11:04 PM
NO RATINGS
Dave, EPA requirements were not discussed regarding replacement materials. That said, can you tell us more about the context for the barrier layer you mention? Are you referring to the multi-layer tubing mentioned in the article?

Dave Palmer
User Rank
Platinum
Re: Timely topic
Dave Palmer   5/15/2012 8:08:03 PM
NO RATINGS
@Ann: Any word on how EPA is handling this with regard to permeation requirements? In our application, there is a barrier layer which is made out of PVDF, not nylon-12, and this barrier layer is not changing.   In our design, we rely mainly on this barrier layer (not the nylon-12 itself) to prevent permeation, so we don't expect any problems with EPA approval.  But what about in cases where there is no barrier layer?

Ann R. Thryft
User Rank
Blogger
Re: Timely topic
Ann R. Thryft   5/15/2012 3:01:26 PM
NO RATINGS
Tim, thanks for your input. As I reported, DuPont, among others, said that customers began asking for alternatives about two years ago when supply  began tightening due to increased demand from solar panel makers and the oil & gas industry. Suppliers may well have begun those efforts even earlier internally. However, the main crunch here is caused by the material's use in automotive manufacturing, where changes in materials do not occur or easily. 5,000 hours, or about 7 months, is the usual required time for testing a new material for fuel lines, the main class of parts affected. This has somehow been fast-tracked down to 3 or 4 weeks by the AIAG's action.

Tim
User Rank
Platinum
Re: Timely topic
Tim   5/15/2012 7:05:28 AM
NO RATINGS
Production of nylon 12 monomer feed stock is extremely difficult and expensive to complete on a large scale.  The alternative plans of Dupont and others were most likely completed years ago as an attempt to take market share from Evonik, but they were not cost feasible.  Now with end users scrambling to get some sort of alternative material, they are willing to pay a premium for the alternative material and the testing required to qualify it for use.

TJ McDermott
User Rank
Blogger
Re: Supply chain risks
TJ McDermott   5/15/2012 1:49:05 AM
NO RATINGS
Naperlou, the problem has cropped up repeatedly in the last 10 years.  Two manufacturers in Japan represented a 25% loss of global silicon wafer production after the Earthquake.

The world is WAY too dependent on silicon wafers to tolerate that.  The same applies to plastics.

JIT supply chains may be efficient, but only if the supply chain is guaranteed.  It is not damage tolerant at all.

Engineers need to take a stronger stand proving this to the accounting department.

Ann R. Thryft
User Rank
Blogger
Re: Timely topic
Ann R. Thryft   5/14/2012 1:44:55 PM
NO RATINGS
Dave, thanks for your input. The 40% figure comes from ICIS, the major industry market analyst, so I tend to believe them:
http://www.icis.com/Articles/2012/04/30/9554265/news-focus-producers-scramble-to-provide-polyamide-12-alternatives-for-auto.html
I agree that it will be very interesting to see if using replacements--and specifically bio-plastic replacements--will continue after the supply of nylon 12 comes back up.
There are many other possible replacement products, including Arkema's, but the purpose of the article was not to give a detailed list of alternatives: that's been well covered already in the plastics vertical media and by ICIS.

Page 1/2  >  >>


Partner Zone
Latest Analysis
Factory floor engineers may soon be able to operate machinery and monitor equipment status simply by tapping their eyeglasses.
GE Aviation not only plans to use 3D printing to mass-produce metal parts for its LEAP jet engine, but it's also developing a separate technology for 3D-printing metal parts used in its other engines.
In this TED presentation, Wayne Cotter, a computer engineer turned standup comic, explains why engineers are natural comedians.
IBM's new SyNAPSE chip makes it possible for computers to both memorize and compute simultaneously.
The “Space Kid,” 11, will be one of the first civilians to have his design manufactured in space by NASA, thanks to the City X Project, which inspires kids to think about new 3D-printed inventions that could be useful for humans living in space.
More:Blogs|News
Design News Webinar Series
9/10/2014 11:00 a.m. California / 2:00 p.m. New York
7/23/2014 11:00 a.m. California / 2:00 p.m. New York
7/17/2014 11:00 a.m. California / 2:00 p.m. New York
6/25/2014 11:00 a.m. California / 2:00 p.m. New York
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
Sep 22 - 26, MCU Software Development – A Step-by-Step Guide (Using a Real Eval Board)
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  6


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Next Class: September 30 - October 2
Sponsored by Altera
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Sponsored Content

Technology Marketplace

Copyright © 2014 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service