HOME  |  NEWS  |  BLOGS  |  MESSAGES  |  FEATURES  |  VIDEOS  |  WEBINARS  |  INDUSTRIES  |  FOCUS ON FUNDAMENTALS
  |  REGISTER  |  LOGIN  |  HELP
<<  <  Page 7/9  >  >>
DB_Wilson
User Rank
Platinum
Re: Craftsmanship
DB_Wilson   4/20/2012 9:52:32 AM
NO RATINGS
A hundred years ago it was not I.T. that shut down operations, it was I.S. (industrial steam).

JimP
User Rank
Iron
Caption Contest
JimP   4/20/2012 9:48:26 AM
NO RATINGS
We've gotten the universal motors installed.  Were just waiting on management to see if they go with Edison or Tesla to power this equipment.  Either way, we're set.

wheely
User Rank
Silver
Caption Contest
wheely   4/20/2012 9:38:04 AM
NO RATINGS
 Just think if it were 100 years from now we would be setting at home getting unemployment checks.

Bob Salter
User Rank
Iron
Re: Craftsmanship
Bob Salter   4/20/2012 9:35:38 AM
NO RATINGS
Caption: "We're all waiting for the electrician to come off his break to turn the main  power switch on."

jelvidge
User Rank
Iron
Caption
jelvidge   4/20/2012 9:35:14 AM
NO RATINGS
Coffee breaks were dull affairs before the on-site Costa.

Scott1313
User Rank
Iron
Climate Control
Scott1313   4/20/2012 9:31:42 AM
NO RATINGS
Has anyone found the thermostat for the AC in this joint yet? It is hot up in this trailer.

Bruce T
User Rank
Iron
LEAN Manufacturing
Bruce T   4/20/2012 9:25:59 AM
NO RATINGS
Check out the guy in the center of the picture.

This was how LEAN MANUFACTURING was DISCOVERED!

 

tkane
User Rank
Iron
Phot Caption
tkane   4/20/2012 9:23:41 AM
The same thought ran through everyone's mind.  Break was over 5 minutes ago and how long had the boss been standing there?

tkwanderson
User Rank
Iron
caption
tkwanderson   4/20/2012 9:16:21 AM
NO RATINGS
Everyone could see something was missing, but without the systems architecture drawing, nobody knew!

HarryB
User Rank
Gold
Comment
HarryB   4/20/2012 9:15:52 AM
NO RATINGS
"What a nightmare... I dreamt I was trapped in the Electronic Engineering Times "Immortal Works" contest...   :^)

<<  <  Page 7/9  >  >>


Partner Zone
Latest Analysis
Here are some of the top-paying jobs available to engineers as they grow in their careers.
As manufacturers add new technologies to their products, designing for compliance becomes more difficult. Prepare for the certification testing process. Otherwise, you increase the risk of discovering a safety issue after a product leaves the assembly line. That will cause significant time-to-market delays, be much costlier to fix, and damage your brand in the eyes of customers. 
Stratasys will be exhibiting two groundbreaking large-scale additive manufacturing technologies, as well as other new products, next month at the International Manufacturing Technology Show (IMTS) in Chicago.
Ford Motor Co. announced plans last week to join an ever-growing number of automakers who intend to produce fully autonomous vehicles in the next five years.
Two new technologies from Stratasys, created in partnership with Boeing, Ford, and Siemens, will bring accurate, repeatable manufacturing of very large thermoplastic end products, and much bigger composite parts, onto the factory floor for industries including automotive and aerospace.
More:Blogs|News
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  6 |  7 | 8 | 9 | 10


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Technology Marketplace

Copyright © 2016 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service