HOME  |  NEWS  |  BLOGS  |  MESSAGES  |  FEATURES  |  VIDEOS  |  WEBINARS  |  INDUSTRIES  |  FOCUS ON FUNDAMENTALS
  |  REGISTER  |  LOGIN  |  HELP
<<  <  Page 7/9  >  >>
DB_Wilson
User Rank
Platinum
Re: Craftsmanship
DB_Wilson   4/20/2012 9:52:32 AM
NO RATINGS
A hundred years ago it was not I.T. that shut down operations, it was I.S. (industrial steam).

JimP
User Rank
Iron
Caption Contest
JimP   4/20/2012 9:48:26 AM
NO RATINGS
We've gotten the universal motors installed.  Were just waiting on management to see if they go with Edison or Tesla to power this equipment.  Either way, we're set.

wheely
User Rank
Silver
Caption Contest
wheely   4/20/2012 9:38:04 AM
NO RATINGS
 Just think if it were 100 years from now we would be setting at home getting unemployment checks.

Bob Salter
User Rank
Iron
Re: Craftsmanship
Bob Salter   4/20/2012 9:35:38 AM
NO RATINGS
Caption: "We're all waiting for the electrician to come off his break to turn the main  power switch on."

jelvidge
User Rank
Iron
Caption
jelvidge   4/20/2012 9:35:14 AM
NO RATINGS
Coffee breaks were dull affairs before the on-site Costa.

Scott1313
User Rank
Iron
Climate Control
Scott1313   4/20/2012 9:31:42 AM
NO RATINGS
Has anyone found the thermostat for the AC in this joint yet? It is hot up in this trailer.

Bruce T
User Rank
Iron
LEAN Manufacturing
Bruce T   4/20/2012 9:25:59 AM
NO RATINGS
Check out the guy in the center of the picture.

This was how LEAN MANUFACTURING was DISCOVERED!

 

tkane
User Rank
Iron
Phot Caption
tkane   4/20/2012 9:23:41 AM
The same thought ran through everyone's mind.  Break was over 5 minutes ago and how long had the boss been standing there?

tkwanderson
User Rank
Iron
caption
tkwanderson   4/20/2012 9:16:21 AM
NO RATINGS
Everyone could see something was missing, but without the systems architecture drawing, nobody knew!

HarryB
User Rank
Gold
Comment
HarryB   4/20/2012 9:15:52 AM
NO RATINGS
"What a nightmare... I dreamt I was trapped in the Electronic Engineering Times "Immortal Works" contest...   :^)

<<  <  Page 7/9  >  >>


Partner Zone
Latest Analysis
We shared our list, now Design News readers tell us which artificial intelligence movies they watch again and again.
Researchers have been working on a number of alternative chemistries to lithium-ion for next-gen batteries, silicon-air among them. However, while the technology has been viewed as promising and cost-effective, to date researchers haven’t managed to develop a battery of this chemistry with a viable running time -- until now.
Norway-based additive manufacturing company Norsk Titanium is building what it says is the first industrial-scale 3D printing plant in the world for making aerospace-grade metal components. The New York state plant will produce 400 metric tons each year of aerospace-grade, structural titanium parts.
Researchers have simplified the fabrication of the geometric requirements for fluid motion in microrobots for in vivo medical applications.
The National Aeronautics and Space Administration’s recently announced plan to put an electric airplane in the air by 2018 is forward-looking, but hardly unique.
More:Blogs|News
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
Jul 11 - 15, Embedded System Design Techniques™ - Debugging Real-time Embedded Software – Hands on
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  6 |  7 | 8 | 9 | 10


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Technology Marketplace

Copyright © 2016 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service