HOME  |  NEWS  |  BLOGS  |  MESSAGES  |  FEATURES  |  VIDEOS  |  WEBINARS  |  INDUSTRIES  |  FOCUS ON FUNDAMENTALS
  |  REGISTER  |  LOGIN  |  HELP
GlennA
User Rank
Gold
Re: Poor Design
GlennA   4/19/2012 8:37:24 AM
NO RATINGS
The design constraints were composed by someone with no experience building such a room.  I was told the PLC would only have to monitor the room temperature and relative humidity - the air conditioners would use their internal sensors for temperature, and dehumidifying was assumed to be included.

I remember a saying I was told years ago:  Do you know the best thing about beating your head against a brick wall ?  It feels so good when you stop.  I stopped worrying about the parts of the project that I had no input on or control over.

Mydesign
User Rank
Platinum
Re: Poor Design
Mydesign   4/19/2012 3:54:50 AM
NO RATINGS
1 saves
GlennA, normally we are deploying multiple sensors at different places and average of the sensor values are accounted for decision making. Even most of such devices are equipped with more than one sensor for better accuracy. In such cases these types of failover can be minimized.

Rob Spiegel
User Rank
Blogger
Re: Poor Design
Rob Spiegel   4/18/2012 2:16:51 PM
NO RATINGS
You can only hope the feedback to the manufacturer prompted their engineers to make changes, Glann. Not necessarily, though. Let's hope that the move toward social media in design will help the feedback loop reach the design function.

GlennA
User Rank
Gold
Re: Poor Design
GlennA   4/18/2012 12:22:34 PM
NO RATINGS
naperlou;  I was puzzled that the two heaters were not balanced, but I wouldn't have found that out if the overheat hadn't tripped.  I contacted the manufacturer several times (e-mail) during the process.  I don't know if it caused them to review their design.

naperlou
User Rank
Blogger
Poor Design
naperlou   4/18/2012 10:14:32 AM
NO RATINGS
Glenn, that was good work.  It seems that the dehumidfier was not tested properly after it was desiged.  Kind of reminds me of 1960s English sports cars.



Partner Zone
Latest Analysis
Perfection is a laudable, but ultimately unattainable, goal, even for the world's most successful consumer electronics company. You know the hits; here are Apple's all-time greatest misses.
Siemens' new version of Imagine Lab was designed to help the automotive and aerospace industries meet environmental mandates.
Belden and Secomea have developed a remote access system that gives users a plug-and-play connection to plant assets.
Here are some of the top-paying jobs available to engineers as they grow in their careers.
As manufacturers add new technologies to their products, designing for compliance becomes more difficult. Prepare for the certification testing process. Otherwise, you increase the risk of discovering a safety issue after a product leaves the assembly line. That will cause significant time-to-market delays, be much costlier to fix, and damage your brand in the eyes of customers. 
More:Blogs|News
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  6 |  7 | 8 | 9 | 10


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Technology Marketplace

Copyright © 2016 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service