I wasn't implying that we should live in a perfect world with zero risk of bad things happening. I'm no Pollyanna. And yes, I accept the risk of fatality when driving. But that's me choosing to do so (to some extent; driving is pretty well required much of the time, especially in non-urban areas). I do not choose to drive a car that's potentially fatal, or use a medical device or prescription medicine that could kill me. If I knew about those possible failures ahead of time, I might be able to make different choices, either a different car or medical device or none of the above. If I don't know, then something's wrong. Why should there be so many different electronic doodads, whether automotive or medical, or medications, for example, that require so much time and energy being regulated, all in the name of consumer choice? It looks to me like commercial interests have trumped all others in this regard.
Good point, Ann. What is an acceptable risk if the result is a fatality? I think there are some areas where we accept risk readily. One is driving, mentioned in an earlier comment. Most of us accept that risk on a daily basis. Another, also mentioned in an earlier comment, is exploration. Our current space program is amazingly safe compared to earlier human exploration. Throughout history, we've always accepted high risk for exploration. I agree with you on allergies. No risk of fatality is acceptable to reduce allergies, partly because there are so many alternatives with no risk of fatalities.
These examples are rather spectacular and easily draw our focus. I'd like to offer a slightly different perspective. Part of my current job is to manage medical equipment recalls for a VERY large healthcare organization. Why would an engineer do this? Because someone needs to understand the technology,its failure modes and how those failures will affect patients (which I'm one as well).
I review over 2000 identified medical device failures/hazards per year. It's simply too many to effectively track each one to it's final resolution. I have to manage the risk - i need to triage the issues for impact and where I can be most effective. As much as I'd like to track every one down and ensure all of our hospitals can manage the problem, it's simply not possible. That means there's a chance that a patient will be injured or die because I didn't follow up on the 'right' issue. It's terrifying, but that's simply the way it is. No company can perform perfect risk elimination. In the real worlld, we have to perform risk management, we have to focus limited resources where we think they will do the most good. And sometimes, we get it wrong.
We all like perfection, but it is not achievable. So we developed methods to guess how close to perfection we are. These methods aren't perfect either.
The Columbia 'accident' may have been preventable; I think it was the book "Comm Check". Several engineers' / groups' concerns, if acted on, could have detected the damage.
The Challenger ' incident' was preventable. I think that was the book "The Challenger Launch Decision". The Shuttle operational limits were something like 40F to 99F. So when ice was observed on the vehicle, the engineers' recommendations against launch were well founded.
Before that was Apollo 1, when engineers argued against a 100% oxygen test, on top of many poor design features.
In each case, the advice of the engineers (experts) was ignored or over-ruled. I had much more respect for NASA before reading these books.
The 45% failure rate is incredible and unacceptable, and I would think that the appropriate standards organizations could have a say in the future of blowout preventer systems designs.
Thanks for a great article. I agree with Rob, you'd think that it's the scarier real-world numbers that would be paid attention to, not what is supposedly the norm based on a few tests.
But the numbers also need to be related to actual people and actual harm, not thought about abstractly. If the statistical likelihood of something occurring is greater than zero and that occurrence has fatal results, then that risk is too high. For example, I once took a prescription medical for allergies that started getting bad press for fatal heart attacks. When discussing this with my doctor he said "but the risk is only 2%." Uh, right, but what if I'm in that 2%? No thanks.
Nice article. Seems to me that if the blowout perventer's actual performance included a real-world 45 percent failure rate -- even while tests indicated an 0.07 percent failure rate, this would be grounds to call a foul and look into whether the blowout preventer system was adequate protection against catastrophe. Is this an example of regulators asleep at the wheel?
Excellent point, Dave. I should note that I spoke with Roger Boisjoly after the Challenger disaster. (He was the one engineer who resisted going ahead with the launch, and lost his job as a result.) I also attended the first Washington, D.C. hearing of the Rogers Committee. That's the group where the late physicist Richard Feynman famously dipped an o-ring in ice water to show how brittle it became. I could go on; it was a fascinating experience.
Another excellent article by Professor Petroski. In a couple of other recent threads on this site there has been some discussion of groupthink, and the kind of treatment which engineers who challenge it can expect.
When I worked in quality, I often encountered the argument, "We've accepted this out-of-spec condition before and everything worked out ok, so we might as well accept it now." My response was always, "If you're playing Russian roulette and you pull the trigger and no bullet comes out, does that mean no bullet will come out the next time you pull the trigger?"
Andrew Morris designed a circuit that could detect a stroke victim's groan and convert the sound into a signal so caregivers would know when help was needed.
New disc magnet motors fit into the design trend of stepping up to closed loop performance while maintaining the cost advantage of stepper motor technology.
At the Design News webinar on June 27, learn all about aluminum extrusion: designing the right shape so it costs the least, is simplest to manufacture, and best fits the application's structural requirements.
On April 21, NASA launched a novel project, putting into orbit three satellites that employ an off-the-shelf commercial smartphone as the control system.
From Dell / Intel® New Paradigms in Design Work Scott Hamilton, vertical market strategist for Dell Precision workstations, 5/2/2013 5
Early in my career, I worked as a draftsman and remember the days of drawing on vellum with numbered pencils and Mylar with plastic lead. This was a fun experience in the sense that I ...
I've been using workstations for more than 10 years and love finding ways to get more performance from my system. With demanding professional applications that require more power each ...
A lasting memory from my first job as an engineer in an auto assembly plant is standing on hard concrete at six in the morning, vending-machine coffee clutched in hand, listening to ...
For industrial control applications, or even a simple assembly line, that machine can go almost 24/7 without a break. But what happens when the task is a little more complex? That’s where the “smart” machine would come in. The smart machine is one that has some simple (or complex in some cases) processing capability to be able to adapt to changing conditions. Such machines are suited for a host of applications, including automotive, aerospace, defense, medical, computers and electronics, telecommunications, consumer goods, and so on. This radio show will show what’s possible with smart machines, and what tradeoffs need to be made to implement such a solution.
To save this item to your list of favorite Design News content so you can find it later in your Profile page, click the "Save It" button next to the item.
If you found this interesting or useful, please use the links to the services below to share it with other readers. You will need a free account with each service to share an item via that service.