clarksammy
User Rank
Iron
Happens!
clarksammy   12/20/2011 7:43:02 AM
NO RATINGS
It happens sometimes! Even if we have a good knowledge about something but sometimes we miss something that make the whole module unsuccessful and we are not able to detect it for long time!

schools as community centres

Rob Spiegel
User Rank
Blogger
Re: Happens!
Rob Spiegel   12/20/2011 3:02:12 PM
NO RATINGS
You're right, ClarkSammy, one small materials swap/SNAFU and everything quits working right. Like most Sherlock Ohms blogs, this is a difficult problem to detect.

roddalitz
User Rank
Gold
Quality ... ?
roddalitz   12/21/2011 9:13:48 AM
NO RATINGS
So you are telling us that you were criticised first for stopping a line with bad product, then for failing to certify a bad product? That has a LOT in common with all the Made-by-Monkeys tales about modern product reliability. This story says bad products may be more due to managment than engineering.

Rob Spiegel
User Rank
Blogger
Re: Quality ... ?
Rob Spiegel   12/21/2011 1:35:16 PM
NO RATINGS

Good point Roddalitz. Makes one curious about how common a situation likes this is. From the description, management didn't seem too concerned about the product failing in use. I may have been pressure to make quota. Or it could have been management not understanding the potential repercussions of bad product going out the door.


Dave Palmer
User Rank
Platinum
Re: Quality ... ?
Dave Palmer   12/22/2011 11:38:50 AM
NO RATINGS
At some companies, the pressure to get parts out the door can be intense.  At one company I worked at, engineers had the power to sign off non-conforming parts as "ok to use," or to tell manufacturing to sort the parts on the line.

One day I was surprised to learn that an MIT-educated engineer had signed "sort on line" for some parts which I was sure couldn't be sorted.  Measuring to find the non-conformance involved a destructive test.  If you checked 100% of them, you wouldn't have any parts left to build with! What genius solution had he come up with?

"Oh, I don't know.  I hadn't thought of that," he said.  "Anyway, it's manufacturing's job to figure out how to sort the parts, not mine."

"Do you even know what the non-conformance you just signed off on was?" I asked him.

"No, I just sign these things when purchasing tells me to sign them," he said. "They told me production needed the parts, so I released them."

While this might seem like a gross abdication of professional responsibility -- what would have happened if purchasing told him to sign off 'use as is'? -- I couldn't totally blame the engineer in question.  The processes which the company had in place, and the underlying corporate culture, promoted this kind of carelessness at every level.  Everything was always someone else's problem, and nobody really thought very much about the consequences of their actions.

It was a little like the TV show "The Office," except instead of making paper products, the company made safety-critical vehicle components.

In my short time at the company in question, I was able to institute new quality procedures which improved the handling of non-conforming material, and also cut down on the amount of non-conforming material coming in the door.  But changing the underlying culture would have been a Herculean task.  And, unfortunately, I suspect that this culture is not confined to just one company.

Rob Spiegel
User Rank
Blogger
Re: Quality ... ?
Rob Spiegel   12/22/2011 11:58:46 AM
NO RATINGS
Good story, Dave.

I'm curious as to whether you received blowback from customers due to the sloppy quality control. Did any of the parts go out into the world and fail -- or at least fail to do what the part was expected to do?

Dave Palmer
User Rank
Platinum
Re: Quality ... ?
Dave Palmer   12/22/2011 4:09:18 PM
NO RATINGS
@Rob: Yes, there were examples of parts failing in the field.  Fortunately, they were less common than you might expect -- and even more fortunately, none of them (that I know of, while I was there) resulted in people getting hurt.  This might be an example of the saying, "Fortune favors the foolish."

I'd rather not give any details of the failures for now, since it would be difficult to do so without giving away identifying information about the company.

I will, however, give one example of a quality system failure.  Manufacturing was allowed to build assemblies using non-inspected components, provided that the assemblies were marked with pink tags which said "QUALITY INSPECTION IN PROGRESS -  DO NOT SHIP." The assemblies were to be held at shipping until the component inspections were complete.  If the components were found to be non-conforming, the assemblies would have to be taken apart.  If the components were found to be okay, the quality department would remove the tags and release the assemblies to be shipped.

Inevitably, however, after completing the inspection, the quality inspectors would go to shipping and find nothing but a pink tag lying on the floor.  The parts would have already been shipped.

At least once, the shippers didn't even bother to take the tags off, so assemblies were shipped to a customer with the "DO NOT SHIP" tags still on them.  I'm still not quite sure how the sales team was able to explain that one.

Rob Spiegel
User Rank
Blogger
Re: Quality ... ?
Rob Spiegel   12/23/2011 11:15:01 AM
NO RATINGS
That's funny about the tags, Dave. Ultimately, though, I would guess that parts failing in the field would be more costly than the cost of shutting down the line and restarting or having a shipment go late because parts had to be re-run to get them right.

jmiller
User Rank
Platinum
Re: Quality ... ?
jmiller   12/26/2011 9:47:15 PM
NO RATINGS
Worst part is, this type of situation arises far too often.  And it's usually frowned upon to inform management that if you choose to use this you will have a high number of service calls.  And it's frowned upon to stop the line.  And it's frowned upon to say this part won't work for this design.  What is an engineer to do?  thanks for doing the right thing.  No matter what management thinks.

Rob Spiegel
User Rank
Blogger
Re: Quality ... ?
Rob Spiegel   12/29/2011 1:17:32 PM
NO RATINGS
Sometimes it isn't a matter of doing the right thing. If the engineer does not have the power to stop the line or call for a re-design then doing the right thing may not be an option. 

Page 1/2  >  >>


Partner Zone
Latest Analysis
Advertised as the "Most Powerful Tablet Under $100," the Kindle Fire HD 6 was too tempting for the team at iFixit to pass up. Join us to find out if inexpensive means cheap, irreparable, or just down right economical. It's teardown time!
The first photos made with a 3D-printed telescope are here and they're not as fuzzy as you might expect. A team from the University of Sheffield beat NASA to the goal. The photos of the Moon were made with a reflecting telescope that cost the research team 100 to make (about $161 US).
At Medical Design & Manufacturing Midwest, Joe Wascow told Design News how Optimal Design prototyped a machine that captures the wing-beat of a duck.
The increased adoption of wireless technology for mission-critical applications has revved up the global market for dynamic electronic general purpose (GP) test equipment. As the link between cloud networks and devices -- smartphones, tablets, and notebooks -- results in more complex devices under test, the demand for radio frequency test equipment is starting to intensify.
Much of the research on lithium-ion batteries is focused on how to make the batteries charge more quickly and last longer than they currently do, work that would significantly improve the experience of mobile device users, as well EV and hybrid car drivers. Researchers in Singapore have come up with what seems like the best solution so far -- a battery that can recharge itself in mere minutes and has a potential lifespan of 20 years.
More:Blogs|News
Design News Webinar Series
10/7/2014 8:00 a.m. California / 11:00 a.m. New York
9/25/2014 11:00 a.m. California / 2:00 p.m. New York
9/10/2014 11:00 a.m. California / 2:00 p.m. New York
7/23/2014 11:00 a.m. California / 2:00 p.m. New York
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
Oct 20 - 24, How to Design & Build an Embedded Web Server: An Embedded TCP/IP Tutorial
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  6


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Next Class: 10/28-10/30 11:00 AM
Sponsored by Stratasys
Next Class: 10/28-10/30 2:00 PM
Sponsored by Gates Corporation
Next Class: 11/11-11/13 2:00 PM
Sponsored by Littelfuse
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Sponsored Content

Technology Marketplace

Copyright © 2014 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service