HOME  |  NEWS  |  BLOGS  |  MESSAGES  |  FEATURES  |  VIDEOS  |  WEBINARS  |  INDUSTRIES  |  FOCUS ON FUNDAMENTALS
  |  REGISTER  |  LOGIN  |  HELP
Beth Stackpole
User Rank
Blogger
Re: 3-D and simulation - a new world
Beth Stackpole   10/31/2012 8:42:04 AM
NO RATINGS
@BobGroh: It's always helpful to hear about these on-going, real-world examples of how 3D virtual simulation is helping to drastically reduce iterations in the design cycle. I hear over and over again how critical early-on simulation is helping companies pinpoint potential design problems far earlier in the process.

BobGroh
User Rank
Platinum
3-D and simulation - a new world
BobGroh   11/9/2011 11:20:58 AM
NO RATINGS
The new (and not so new) simulation and 3D virtual visulation tools are absolutely amazing. The ability to do comprehensive design work in a virtual environment is such an aid to reducing design time and, perhaps more importantly, reducing errors.

In one case I was involved in a number of years ago, our design people were able to integrate our pcb designs (with all the parts installed) into the actual mechical designs and then do a 'walk around' to look for interference fits, ability to install and remove the various parts, etc.  A huge aid to everyone on the design team. And a huge help in cutting down the number of design iterations.

 

Ivan Kirkpatrick
User Rank
Platinum
Virtual Reality is Economical
Ivan Kirkpatrick   7/14/2011 1:08:48 PM

I have used virtual reality systems in Design and I can attest to the fact that they save a lot of time effort and money in the design and construction of various systems.

I spent a few years in submarine design and we used 3-D Simulation and Virtual Reality for the SEAWOLF attack submarine design.  Previous ship designs involved a full size mockup of steel, wood and ropes (ropes simulated cables) and the customer would go through the mockup and observe various layouts and arrangements of equipment.  For the new design, we eventually replaced the more limited physical mockup with a virtual walk through and simulations.

One goal we had was to dynamically change the size and shapes of a component based on the engineering loads imposed on it.  I was tasked with creating a software routine to resize a seawater heat exchanger based on the requirements for the ships' speed.  The idea was to be able to resize the engineering plant dynamically to suit various operational scenarios.

I think most engineers and designers realize that for a construction project as big as a ship and one that takes so long to build that the construction has to start before the design is completely finished.  Long lead time materials and manufacturing times contribute to make this a very difficult problem in logistics and management.

By applying the 3-D virtual reality early and effectively some of these problems can be resolved sooner and in a more cost effective manner.  I can see a point in time when a component manufacturer is required to supply not only the physical hardware but appropriate 3-D models for use in the simulations as well.  Eventually we would like to be able to test in a 3-D simulation alternative components and evaluate them for the various characteristics of interest.  These might be power consumption, EM radiation interference, physical size, quietness of operation and maintainability. 




Partner Zone
Latest Analysis
Samsung's Galaxy line of smartphones used to fare quite well in the repairability department, but last year's flagship S5 model took a tumble, scoring a meh-inducing 5/10. Will the newly redesigned S6 lead us back into star-studded territory, or will we sink further into the depths of a repairability black hole?
Fifteen European research centers have launched EuroCPS to help European companies develop innovative products for the Internet of Things.
Get your Allman Brothers albums ready. The iconic Volkswagen Microbus may be poised for a comeback, and this time it could be electric.
In 2003, the world contained just over 500 million Internet-connected devices. By 2010, this figure had risen to 12.5 billion connected objects, almost six devices per individual with access to the Internet. Now, as we move into 2015, the number of connected 'things' is expected to reach 25 billion, ultimately edging toward 50 billion by the end of the decade.
NASA engineer Brian Trease studied abroad in Japan as a high school student and used to fold fast-food wrappers into cranes using origami techniques he learned in library books. Inspired by this, he began to imagine that origami could be applied to building spacecraft components, particularly solar panels that could one day send solar power from space to be used on earth.
More:Blogs|News
Design News Webinar Series
3/31/2015 11:00 a.m. California / 2:00 p.m. New York
2/25/2015 11:00 a.m. California / 2:00 p.m. New York
12/11/2014 8:00 a.m. California / 11:00 a.m. New York
5/7/2015 11:00 a.m. California / 2:00 p.m. New York
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
Apr 20 - 24, Taking the Internet of Things to the Cloud
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  6 |  7


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Last Archived Class
Sponsored by Proto Labs
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Sponsored Content

Technology Marketplace

Copyright © 2015 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service