HOME  |  NEWS  |  BLOGS  |  MESSAGES  |  FEATURES  |  VIDEOS  |  WEBINARS  |  INDUSTRIES  |  FOCUS ON FUNDAMENTALS
  |  REGISTER  |  LOGIN  |  HELP
Feature
Automation & Motion Control
Case Study: Building Your Own 20kW Hydroelectric Power Plant
11/16/2011

< Previous   Image 2 of 5      Next >

The control panel contains an AutomationDirect DirectLogic 05 Micro Brick PLC, a C-More HMI panel, I/O, and associated components.
The control panel contains an AutomationDirect DirectLogic 05 Micro Brick PLC, a C-More HMI panel, I/O, and associated components.

< Previous   Image 2 of 5      Next >

Return to Article

View Comments: Newest First|Oldest First|Threaded View
<<  <  Page 6/6
Rob Spiegel
User Rank
Blogger
Connected to the grid
Rob Spiegel   11/16/2011 12:04:44 PM
NO RATINGS
Great idea. Getting tied into the grid seems to be an important factor here. Saves the whole problem of storage. The perspiration will probably pay for itself in time, since the foundation is the least likely part of this power plant to fail over time. 

Alexander Wolfe
User Rank
Blogger
80/20 Rule
Alexander Wolfe   11/16/2011 8:17:03 AM
NO RATINGS
This interesting case study spotlights the old rule that most great engineering efforts are 80% perspiration (actually, I think it's 90%) and 20% technical smarts. This project simply wouldn't have happened without all that digging, building, and dirt moving.

<<  <  Page 6/6
Partner Zone
Latest Analysis
Time was when sports equipment was made only from common, everyday, low-tech materials. But now sports equipment has a new, high-tech ingredient that is helping players take their game to the next level.
Every now and then Design News likes to revisit some of our favorite Gadget Freak projects. Robotic hands, manipulated Kindles, and smart recycling cans round out the latest crop.
A humanoid diving robot has recovered treasure from the wreck of French King Louis XIV's flagship, untouched for nearly 400 years. The bot not only looks somewhat human-shaped, it's also got stereoscopic humanlike vision, artificial intelligence, and haptic force feedback.
Design collaboration now includes the entire value chain. From suppliers to customers, purchasing to outside experts, the collaborative design team includes internal and external groups. The design process now stretches across the globe in multiple software formats.
Researchers have developed a hybrid energy harvester for generating electricity from multiple spectrums of solar energy.
More:Blogs|News
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  6 |  7 | 8 | 9


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Technology Marketplace

Copyright © 2016 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service