HOME  |  NEWS  |  BLOGS  |  MESSAGES  |  FEATURES  |  VIDEOS  |  WEBINARS  |  INDUSTRIES  |  FOCUS ON FUNDAMENTALS
  |  REGISTER  |  LOGIN  |  HELP
Product News
Mechatronics

Video: ST Robotics' 11-Axis Tandem Robot System

NO RATINGS
View Comments: Threaded|Newest First|Oldest First
Rob Spiegel
User Rank
Blogger
Cool robot
Rob Spiegel   11/2/2012 2:10:06 PM
NO RATINGS
That's a pretty cool video. It really shows the value of the robot. It's nice to see prices coming down on this type of equipment -- a boon for small manufacturers. 

mrdon
User Rank
Platinum
Re: Cool robot
mrdon   11/3/2012 10:34:49 PM
NO RATINGS
Hi Rob, I agree. The movement of the 2 robotic arms are very impressive. I thought the Dremel added a nice touch to the versatility of tools that can be attached to it. I wonder what robotic system is more cost competitive, ReThink Robotics "Baxter" or the ST Robotics Tandem Robot System? Very cool video!!

William K.
User Rank
Platinum
eleven axis robotic system
William K.   11/5/2012 10:46:49 AM
NO RATINGS
In theory at least it should not be that very difficult to link the two robots into one robotic program. Putting two 5-axis robots on a common base is an interesting concept, and it does reduce the concerns that would exist using two six-axis robots side by side. One thing that ceratinly will require a bit of extra attention is the much greater inertia encountered when swinging the common axis. Inertia is one of those things that tends to "get in the way" when programming robotic motions. Things that work perfectly at setup speeds suddenly have problems when running at production speeds. This is most obvious when grippers are unable to hold the part securly during high speed changes in direction. The result can be a part weighing several pounds being thrown quite a few feet.

Rob Spiegel
User Rank
Blogger
Re: eleven axis robotic system
Rob Spiegel   11/5/2012 2:23:53 PM
NO RATINGS
Interesting, William. Why would the robot's performance be different in production? Does it have to do with the weight or resistance the robot encounters in production?

William K.
User Rank
Platinum
Re: eleven axis robotic system
William K.   11/5/2012 7:53:59 PM
NO RATINGS
The reason thatbthings seem to be different in production is that the robots move much faster than during any of the setup modes, and also that (it seems), the production staff tend to run robots toward their maximum capabilities. The very exciting experience that I had was a robot that I had done the path programming for flinging a six-pound transmission part across the work area. Fortunately we were not yet in a production mode, and the part harmlessly hit the floor twenty feet away. But it certainly could have ruined sombody's day. That incident was the result of the production motion speed being set much faster than it needed to be, and the gripper air pressure being lower than it should have been set at.

Ann R. Thryft
User Rank
Blogger
Re: eleven axis robotic system
Ann R. Thryft   11/15/2012 4:51:17 PM
NO RATINGS
William, thanks for giving us a description of that incident: very scary, indeed. I can see why there's so much concern about careful industrial robotics programming.

Partner Zone
Latest Analysis
Lockheed Martin is looking to a new novel alloy and casting process to cut expenses on the F-35 Lightning II -- the world's costliest fighter jet.
After impressive test results, QM Power's Q-Sync fan motor has been identified as an emerging energy-saving technology and earned additional funding from the Department of Energy.
Henn'na Hotel, a next-generation, eco-friendly hotel in Nagasaki, Japan, is staffed almost entirely by robots.
With the pace of new editions and iterations, designers can fall behind quickly on software knowledge and skills. That's where JIT software training comes in.
After more than a century of dedicated service, metals are still upping their game and delivering lighter, stronger bodies and frames to the auto industry.
More:Blogs|News
Design News Webinar Series
6/25/2015 11:00 a.m. California / 2:00 p.m. New York
6/24/2015 11:00 a.m. California / 2:00 p.m. New York
6/11/2015 11:00 a.m. California / 2:00 p.m. New York
8/13/2015 11:00 a.m. California / 2:00 p.m. New York
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
Aug 3 - 7, Developing, Testing, and Troubleshooting IPv4 and IPv6 Using Wireshark
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  6 |  7


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Next Course August 25-27:
Sponsored by Stratasys
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Sponsored Content

Technology Marketplace

Copyright © 2015 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service