HOME  |  NEWS  |  BLOGS  |  MESSAGES  |  FEATURES  |  VIDEOS  |  WEBINARS  |  INDUSTRIES  |  FOCUS ON FUNDAMENTALS
  |  REGISTER  |  LOGIN  |  HELP
Feature
Automation & Motion Control

A Strategy for Better Test Equipment Management

NO RATINGS
1 saves
View Comments: Threaded|Newest First|Oldest First
Alexander Wolfe
User Rank
Blogger
Expensive equipment requires a management plan
Alexander Wolfe   6/23/2011 5:25:09 PM
NO RATINGS
Thanks for an informative article, Paul. Given the cost and sophistication of modern test equipment, a holistic equipment management strategy is essentially mandatory. At the same time, an article like this makes me fondly recall the old days, working with tube-based oscilloscopes. The test-equipment management strategy back then was, if the equipment acted up, you gave it a good whack on the side.

PaulMcNamara
User Rank
Iron
Re: Expensive equipment requires a management plan
PaulMcNamara   6/28/2011 3:52:15 PM
NO RATINGS
Thanks Alexander.  It may seem hard to believe be ocassionally we find old vacuum tube equipment (or old equipment generally, even if it's not vacuum tube) piled away "just in case the program comes back".  While that concern does need to be cared for (and we do) the mentality of holding on / hoarding equipment is costly to the design engineer in ways they may not be able to imagine.  Thanks again for your post. 

Jack Rupert, PE
User Rank
Platinum
Small Companies Too
Jack Rupert, PE   6/28/2011 3:17:01 PM
NO RATINGS
Excellent article Paul.  The need for a holistic approach is necessary on the other side of industry too, where you're not dealing with $100M setups.  In those cases, however, the problem is not so much of the wrong approach being pushed down from above, but rather no unified approach whatsoever. Equipment, procedures etc. are just procured on as-needed basis and nothing is tied together.

PaulMcNamara
User Rank
Iron
Re: Small Companies Too
PaulMcNamara   6/28/2011 3:48:37 PM
NO RATINGS
Thanks Jack. I couldn't agree more with what you say.  Large companies can be thought of as collections of smaller lab entitites  Often each lab has its own process, procedure and spreadsheet -- almost identical to what you are talking about.  We've actaully got a refined set of processes, supported by software tools and including people strategies.  While we often write about the "big guys", as you say, the approach works for smaller companies as well.  We are working on a couple of new offers that are scaled but but we think we will helpful to smaller companies.  Thanks again.

Partner Zone
Latest Analysis
Advertised as the "Most Powerful Tablet Under $100," the Kindle Fire HD 6 was too tempting for the team at iFixit to pass up. Join us to find out if inexpensive means cheap, irreparable, or just down right economical. It's teardown time!
The first photos made with a 3D-printed telescope are here and they're not as fuzzy as you might expect. A team from the University of Sheffield beat NASA to the goal. The photos of the Moon were made with a reflecting telescope that cost the research team 100 to make (about $161 US).
At Medical Design & Manufacturing Midwest, Joe Wascow told Design News how Optimal Design prototyped a machine that captures the wing-beat of a duck.
The increased adoption of wireless technology for mission-critical applications has revved up the global market for dynamic electronic general purpose (GP) test equipment. As the link between cloud networks and devices -- smartphones, tablets, and notebooks -- results in more complex devices under test, the demand for radio frequency test equipment is starting to intensify.
Much of the research on lithium-ion batteries is focused on how to make the batteries charge more quickly and last longer than they currently do, work that would significantly improve the experience of mobile device users, as well EV and hybrid car drivers. Researchers in Singapore have come up with what seems like the best solution so far -- a battery that can recharge itself in mere minutes and has a potential lifespan of 20 years.
More:Blogs|News
Design News Webinar Series
10/7/2014 8:00 a.m. California / 11:00 a.m. New York
9/25/2014 11:00 a.m. California / 2:00 p.m. New York
9/10/2014 11:00 a.m. California / 2:00 p.m. New York
7/23/2014 11:00 a.m. California / 2:00 p.m. New York
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
Oct 20 - 24, How to Design & Build an Embedded Web Server: An Embedded TCP/IP Tutorial
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  6


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Next Class: 10/28-10/30 11:00 AM
Sponsored by Stratasys
Next Class: 10/28-10/30 2:00 PM
Sponsored by Gates Corporation
Next Class: 11/11-11/13 2:00 PM
Sponsored by Littelfuse
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Sponsored Content

Technology Marketplace

Copyright © 2014 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service