A Strategy for Better Test Equipment Management

NO RATINGS
1 saves
View Comments: Oldest First|Newest First|Threaded View
Alexander Wolfe
User Rank
Blogger
Expensive equipment requires a management plan
Alexander Wolfe   6/23/2011 5:25:09 PM
NO RATINGS
Thanks for an informative article, Paul. Given the cost and sophistication of modern test equipment, a holistic equipment management strategy is essentially mandatory. At the same time, an article like this makes me fondly recall the old days, working with tube-based oscilloscopes. The test-equipment management strategy back then was, if the equipment acted up, you gave it a good whack on the side.

Jack Rupert, PE
User Rank
Platinum
Small Companies Too
Jack Rupert, PE   6/28/2011 3:17:01 PM
NO RATINGS
Excellent article Paul.  The need for a holistic approach is necessary on the other side of industry too, where you're not dealing with $100M setups.  In those cases, however, the problem is not so much of the wrong approach being pushed down from above, but rather no unified approach whatsoever. Equipment, procedures etc. are just procured on as-needed basis and nothing is tied together.

PaulMcNamara
User Rank
Iron
Re: Small Companies Too
PaulMcNamara   6/28/2011 3:48:37 PM
NO RATINGS
Thanks Jack. I couldn't agree more with what you say.  Large companies can be thought of as collections of smaller lab entitites  Often each lab has its own process, procedure and spreadsheet -- almost identical to what you are talking about.  We've actaully got a refined set of processes, supported by software tools and including people strategies.  While we often write about the "big guys", as you say, the approach works for smaller companies as well.  We are working on a couple of new offers that are scaled but but we think we will helpful to smaller companies.  Thanks again.

PaulMcNamara
User Rank
Iron
Re: Expensive equipment requires a management plan
PaulMcNamara   6/28/2011 3:52:15 PM
NO RATINGS
Thanks Alexander.  It may seem hard to believe be ocassionally we find old vacuum tube equipment (or old equipment generally, even if it's not vacuum tube) piled away "just in case the program comes back".  While that concern does need to be cared for (and we do) the mentality of holding on / hoarding equipment is costly to the design engineer in ways they may not be able to imagine.  Thanks again for your post. 

Partner Zone
Latest Analysis
Take a look at the top 20 US undergraduate engineering programs. Then tell us -- did your school make the cut?
Producing high-quality end-production metal parts with additive manufacturing for applications like aerospace and medical requires very tightly controlled processes and materials. New standards and guidelines for machines and processes, materials, and printed parts are underway from bodies such as ASTM International.
Engineers at the University of San Diego’s Jacobs School of Engineering have designed biobatteries on commercial tattoo paper, with an anode and cathode screen-printed on and modified to harvest energy from lactate in a person’s sweat.
A Silicon Valley company has made the biggest splash yet in the high-performance end of the electric car market, announcing an EV that zips from 0 to 60 mph in 3.4 seconds and costs $529,000.
The biggest robot swarm to date is made of 1,000 Kilobots, which can follow simple rules to autonomously assemble into predetermined shapes. Hardware and software are open-source.
More:Blogs|News
Design News Webinar Series
7/23/2014 11:00 a.m. California / 2:00 p.m. New York
7/17/2014 11:00 a.m. California / 2:00 p.m. New York
6/25/2014 11:00 a.m. California / 2:00 p.m. New York
5/13/2014 10:00 a.m. California / 1:00 p.m. New York / 6:00 p.m. London
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
Sep 8 - 12, Get Ready for the New Internet: IPv6
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  6


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Next Class: September 30 - October 2
Sponsored by Altera
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Sponsored Content

Technology Marketplace

Copyright © 2014 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service