HOME  |  NEWS  |  BLOGS  |  MESSAGES  |  FEATURES  |  VIDEOS  |  WEBINARS  |  INDUSTRIES  |  FOCUS ON FUNDAMENTALS
  |  REGISTER  |  LOGIN  |  HELP
Feature
Automation & Motion Control

A Strategy for Better Test Equipment Management

NO RATINGS
1 saves
View Comments: Newest First|Oldest First|Threaded View
PaulMcNamara
User Rank
Iron
Re: Expensive equipment requires a management plan
PaulMcNamara   6/28/2011 3:52:15 PM
NO RATINGS
Thanks Alexander.  It may seem hard to believe be ocassionally we find old vacuum tube equipment (or old equipment generally, even if it's not vacuum tube) piled away "just in case the program comes back".  While that concern does need to be cared for (and we do) the mentality of holding on / hoarding equipment is costly to the design engineer in ways they may not be able to imagine.  Thanks again for your post. 

PaulMcNamara
User Rank
Iron
Re: Small Companies Too
PaulMcNamara   6/28/2011 3:48:37 PM
NO RATINGS
Thanks Jack. I couldn't agree more with what you say.  Large companies can be thought of as collections of smaller lab entitites  Often each lab has its own process, procedure and spreadsheet -- almost identical to what you are talking about.  We've actaully got a refined set of processes, supported by software tools and including people strategies.  While we often write about the "big guys", as you say, the approach works for smaller companies as well.  We are working on a couple of new offers that are scaled but but we think we will helpful to smaller companies.  Thanks again.

Jack Rupert, PE
User Rank
Platinum
Small Companies Too
Jack Rupert, PE   6/28/2011 3:17:01 PM
NO RATINGS
Excellent article Paul.  The need for a holistic approach is necessary on the other side of industry too, where you're not dealing with $100M setups.  In those cases, however, the problem is not so much of the wrong approach being pushed down from above, but rather no unified approach whatsoever. Equipment, procedures etc. are just procured on as-needed basis and nothing is tied together.

Alexander Wolfe
User Rank
Blogger
Expensive equipment requires a management plan
Alexander Wolfe   6/23/2011 5:25:09 PM
NO RATINGS
Thanks for an informative article, Paul. Given the cost and sophistication of modern test equipment, a holistic equipment management strategy is essentially mandatory. At the same time, an article like this makes me fondly recall the old days, working with tube-based oscilloscopes. The test-equipment management strategy back then was, if the equipment acted up, you gave it a good whack on the side.

Partner Zone
Latest Analysis
The promise of the Internet of Things (IoT) is that devices, gadgets, and appliances we use every day will be able to communicate with one another. This potential is not limited to household items or smartphones, but also things we find in our yard and garden, as evidenced by a recent challenge from the element14 design community.
Researchers have developed a new flexible fabric that integrates both movement and sensors, introducing new potential for technology-embedded clothing and soft robots.
Made by Monkeys highlights products that somehow slipped by the QC cops.
If you didn't realize that PowerPoint presentations are inherently hilarious, you have to see Don McMillan take one apart. McMillan -- aka the Technically Funny Comic -- worked for 10 years as an engineer before he switched to stand-up comedy.
The first Tacoma Narrows Bridge was a Washington State suspension bridge that opened in 1940 and spanned the Tacoma Narrows strait of Puget Sound between Tacoma and the Kitsap Peninsula. It opened to traffic on July 1, 1940, and dramatically collapsed into Puget Sound on November 7, just four months after it opened.
More:Blogs|News
Design News Webinar Series
11/19/2014 11:00 a.m. California / 2:00 p.m. New York
11/6/2014 11:00 a.m. California / 2:00 p.m. New York
10/7/2014 8:00 a.m. California / 11:00 a.m. New York
12/11/2014 8:00 a.m. California / 11:00 a.m. New York
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
Dec 1 - 5, An Introduction to Embedded Software Architecture and Design
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  6


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Last Archived Class
Sponsored by Littelfuse
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Sponsored Content

Technology Marketplace

Copyright © 2014 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service