ADVERTISEMENT
You will be redirected to your destination in 10 seconds.
Electronics Industry Search

Polling Question

Should the government bail out U.S. automakers?

  • Yes
  • No



View Previous Poll Results
Advertisement

Link This | Email this | Blog This | Comments (0)

Criminal Charges Avoided: Big Dig Contractors' Settlement Tops $458 Million

January 23, 2008

The firms responsible for designing and managing Boston’s Big Dig project reached a $458 million settlement with state and federal officials today. The settlement will allow these companies to avoid criminal charges in the 2006 fatal tunnel collapse and any civil liabilities with infrastructure problems. The settlement and terms were announced this afternoon at a press conference with U.S. Attorney Michael Sullivan and Attorney General Martha Coakley. Under the settlement terms, Bechtel/Parsons Brinckerhoff will pay $407 million and 24 other companies involved in the project will pay about $51 million.

 

The settlement will keep Bechtel/Parsons Brinckerhoff from facing criminal charges in the death of a 38-year-old woman who was killed in July 2006 when a portion of the I-90 Connector tunnel collapsed and crushed the car she was a passenger in. Her husband survived the accident.

 

State officials could seek additional money from Bechtel/Parsons Brinckerhoff over the next 10 years if the project has a major failure in the future causing more than $50 million in damage. Its liability would be capped at $100 million.

Posted by Elizabeth Taurasi on January 23, 2008 | Comments (0)
Industries:
POST A COMMENT
Display Name
captcha

Before submitting this form, please type the code above:

Advertisement
Advertisement

Design News Partner Zones

AnarkCAD/CAE Model Clean-Up: Reduce Iterative Cycles
This webinar featured research and survey results related to problems associated with preparing CAD geometry for CAE applications.  We discussed how Recipe-Based Automation can help create "just-in-time" CAE-ready geometry each time a cad model is updated. Watch the Presentation


Light Matters: Systems Level Approach to HBLED illumination applications
Its good practice to apply a systems-level approach to high-brightness LED (HBLED) illumination applications. Minimally, the system includes the optical, thermal and electrical characteristics of the of the HBLED, the lens (if any) which is built-in to its package, secondary optics such as external plastic lenses/reflectors to direct the light as your application requires and power driver electronics. Read More


Design Engineers' Portal for Sensing and Machine Safety
Whatever industry you're in, or whatever product you manufacture, the right sensors to automate your plant, and to improve your overall efficiency, quality and safety are a must. You'll find Banner Engineering to be an amazing resource of products, training and people with expertise.

Design News Partner Zone Directory »

Please visit these other Reed Business sites