Log In   |  Register Free Newsletter Subscription
Skip navigation
Zibb
Subscribe to Design News
RSS
Email
Average Rating:
  • (0)
    Rate this:
  • Boeing Picks South Carolina for Dreamliner Assembly Plant

    October 29, 2009

    Boeing is getting ready to put the pedal to the metal to accelerate production of the stalled 787 Dreamliner. A second final assembly plant will be built in North Charleston, SC. The new plant, expected to be operational in mid-2011, will also have the capability to support the testing and delivery of the airplanes.

    “Establishing a second 787 assembly line in Charleston will expand our production capability to meet the market demand for the airplane,” said Jim Albaugh, president and CEO of Boeing Commercial Airplanes. “This decision allows us to continue building on the synergies we have established in South Carolina with Boeing Charleston and Global Aeronautica,” he said.

    Boeing Charleston performs fabrication, assembly and systems installation for the 787 aft fuselage sections. Across the street, Global Aeronautica, which is 50 percent owned by Boeing, is responsible for joining and integrating 787 fuselage sections from other structural partners.

    The State of South Carolina is issuing bonds to defray construction costs and is also waiving sales tax for jet fuel on test flights and some construction materials. The move to South Carolina is a rebuke to the aircraft machinists union, which has been at odds with Boeing.  The move also signals a move to try to improve consolidation of Dreamliner production.

    The photo shows the site for the new Dreamliner plant in South Carolina.

    imagephp.jpg

    Posted by Doug Smock on October 29, 2009 | Comments (3)
    Average Rating:
  • (0)
    Rate this:

  • December 2, 2009
    In response to: Boeing Picks South Carolina for Dreamliner Assembly Plant
    floyd thompson commented:

    would like information about application for assembly plant


    December 1, 2009
    In response to: Boeing Picks South Carolina for Dreamliner Assembly Plant
    Kevin commented:

    Can you fill out any application for A and P jobs yet?


    October 30, 2009
    In response to: Boeing Picks South Carolina for Dreamliner Assembly Plant
    Larry Hart commented:

    Has the engineering company been chosen to do the engineering and construction on the new facility ?

    POST A COMMENT
    Display Name
    captcha

    Before submitting this form, please type the characters displayed above. Note the letters are case sensitive:

    Advertisement
    MechatronicsZone Promo
    Advertisement
    Texas Instruments Video Exclusives
    eNewsletters
    Gadget Freak
    Sherlock Ohms
    Made by Monkeys
    Design Tools
    Electronics/Test
    Sensors/LED
    Mechatronics
    Motion Control & Fluid Power
    Materials & Fastening
    Special Technology Reports
    International Engineering



    Please read our Privacy Policy

    About Design News   |   Advertise with Design News   |   Site Map   |   Contact Us   |   Subscription   |   Affiliate Links   |   RSS
    © 2010 Reed Business Information , a division of Reed Elsevier Inc. All rights reserved.
    Use of this Web site is subject to its Terms of Use |  Privacy Policy
    Please visit these other Reed Business sites