You will be redirected to your destination in 10 seconds.
Polling Question
Link This | Email this | Blog This | Comments (0)
First flight for Boeing 787 Dreamliner may be delayed
Boeing tomorrow will offer its second quarterly update on the progress of the 787 Dreamliner as it awaits its maiden voyage which could be delayed. Boeing has been saying late summer which technically means within the next 18 days, but the Seattle Times (ST), citing unnamed sources, reported Saturday that the first flight could be delayed until late October or beyond due to a fastener shortage. The 787 fastener shortage was broken in the Wall Street Journal on June 19. The ST story said that the plane rolled out on July 8 for the plane’s debut was held together with temporary fasteners which had to be replaced with permanent ones. "Power on" when all electrical systems are switched on is still weeks away, the ST reported.
Orders for the plane - 684 at last count, according to the company - have been so strong that the company is considering building 14-16 a month, double the highest rate for the any widebody jet from Boeing or Airbus, according to the Seattle Post-Intelligencer. No doubt, the Boeing’s Everett plant is a busy place these days where Boeing execs and engineers try to reconcile booming demand with parts shortages and complex manufacturing logistics.
The Witchita Eagle also ran the ST story about the possible delay and said the company is seeking to temporarily transfer 60-80 mechanics from Boeing’s defense plant in Wichita to Everett, presumably to alleviate the 787 crunch.
Sponsored Content
Design News Partner Zones
CAD/CAE Model Clean-Up: Reduce Iterative Cycles
This webinar featured research
and survey results related to problems associated with preparing CAD geometry
for CAE applications. We discussed how
Recipe-Based Automation can help
create "just-in-time" CAE-ready geometry each time a cad model is updated. Watch the Presentation
Light Matters: Systems Level Approach to HBLED illumination applications
Its good practice to apply a systems-level approach to high-brightness LED (HBLED) illumination applications. Minimally, the system includes the optical, thermal and electrical characteristics of the of the HBLED, the lens (if any) which is built-in to its package, secondary optics such as external plastic lenses/reflectors to direct the light as your application requires and power driver electronics. Read More
Design Engineers' Portal for Sensing and Machine Safety
Whatever industry you're in, or whatever product you manufacture, the right sensors to automate your plant, and to improve your overall efficiency, quality and safety are a must. You'll find Banner Engineering to be an amazing resource of products, training and people with expertise.

