Jerry dycus
User Rank
Re: Rated life?
Jerry dycus   12/27/2012 9:53:39 AM

   A few  points.  In the future there will be no gearboxes cutting that expensive part and problem.   They will be replaced by larger diameter  generators with many more poles instead.  GE already is doing it on their new units.

     You can't look at a composite part and know if it's ok as delaminations and other problems have little to no visual effect until near fairlure.  But a simple microphone can in real time at low cost. To actually find the problem Xray, Ultrasound or other tech is needed though tapping with a hammer can by someone who knows how.

   The biggest problem are these huge WT's are really investment vehicles generating loans, commissions,  units profits with generating power as a nessasary byproduct. 

    The real future in WT's are  small home, build size units that make/save retail electric cost instead of wholesale electricity thus 2-3x's more cost effective. 

    WT's scale well into the .5kw size units though studying it a 2kw/16' dia size for most homes can supply their needs in many places.

    Another is smaller local wind farms close to the demand as transmission lines for lrager, distant ones can cost as much as the wind farm does!!

They have always said 20 yr life but that has not proven anywhere near tue mostly because they keep increasing size thus don't have time to optimise designs before they are an 'obsolete size'.

  Yet many small units from the 30's are still going strong!!  A decent WT should have a 30-50 yr life simply to cut maintaince costs.



Cabe Atwell
User Rank
Rated life?
Cabe Atwell   12/26/2012 6:01:32 PM
If 20 years is the current focus, what was the product lifetime rating in the past? I suspect much lower.

With the Siemens 6MW turbine, the current world's largest (dec 2012), I would want a 20 year life at the very least. The 8MW Vestas, set for 2015, will be even larger. I say bump the life to 30 years, then we'll have something.


<<  <  Page 3/3
Partner Zone
More Blogs
The transformative nature of designing and making things was the overarching, common theme at separate conferences held in Boston by two giants in the PLM space: Autodesk, with its Accelerate 2015, and Siemens’s Industry Analyst Conference 2015.
Innovations such as “scrum” and virtualization methods have changed the project management game.
Minnesota Electric Technology recently introduced a class of 3.6-inch permanent magnet DC motors for battery-powered (or solar-powered) equipment that occupies the 1/3 - 2 HP space.
On Manufacturing Day, we take a look at the vast changes and top trends in manufacturing happening now.
Design News Webinar Series
10/1/2015 11:00 a.m. California / 2:00 p.m. New York
9/10/2015 11:00 a.m. California / 2:00 p.m. New York
8/13/2015 11:00 a.m. California / 2:00 p.m. New York
6/25/2015 11:00 a.m. California / 2:00 p.m. New York
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
Oct 5 - 9, Standards for the Internet of Things (IoT)
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  6 |  7

Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Sponsored Content

Technology Marketplace

Copyright © 2015 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service