HOME  |  NEWS  |  BLOGS  |  MESSAGES  |  FEATURES  |  VIDEOS  |  WEBINARS  |  INDUSTRIES  |  FOCUS ON FUNDAMENTALS
  |  REGISTER  |  LOGIN  |  HELP
Blogs
Blog
A Broken Gauge Could Blow Up a Plant
10/17/2013

< Previous   Image 2 of 2   

This gauge failed due to impact damage.   (Source: Wika)
This gauge failed due to impact damage.
(Source: Wika)

< Previous   Image 2 of 2   

Return to Article

View Comments: Newest First|Oldest First|Threaded View
<<  <  Page 2/3  >  >>
Larry M
User Rank
Platinum
Re: No surprise.
Larry M   10/18/2013 12:09:01 PM
NO RATINGS
At the large manufacturing company where I have worked for 45 years, we have always had instrument calbration labs. Every piece of equipment has a sticker indicating when calibration is next due. Employees are not permitted to use equipment beyond the calibration due date or equipment which has bypassed the calibration lab.

Simply applying this process to gauges (and fitting a shut-off valve in series with each gauge) would solve this problem.

Rob Spiegel
User Rank
Blogger
Re: WIKA
Rob Spiegel   10/18/2013 11:24:26 AM
NO RATINGS
You're welcome, Car-Nut. This is an interesting subject, a weak spot at plants, and a dangerous weak spot at that.

Rob Spiegel
User Rank
Blogger
Re: It could blow up a plant
Rob Spiegel   10/18/2013 11:08:56 AM
NO RATINGS
That's right, Chuck. Gauges are usually mechanical, and thus they break. When they break, they don't stop anything. All you lose is your ability to monitor what is happening out of sight. But that could be critical.

Car-Nut
User Rank
Iron
WIKA
Car-Nut   10/18/2013 8:59:41 AM
NO RATINGS
As the Logistics manager for WIKA U.S., I must say it's nice to see an article about our organization. Thanks DN.

Rob Spiegel
User Rank
Blogger
Re: No surprise.
Rob Spiegel   10/17/2013 11:58:30 PM
NO RATINGS
I agree, Ann, you have to take the source of this data into consideration. But even if it's half of the 25%, it's significant. Wika also listed a handful of recent plant explosions and speculated they were caused by failed gaugues. Since it's just speculation, I left it out of the story. But it does make you think.

Rob Spiegel
User Rank
Blogger
Re: It could blow up a plant
Rob Spiegel   10/17/2013 11:52:27 PM
NO RATINGS
Yes, GTOlover, it's hard to replace a gauge under high pressure -- or, if the gauge is way below the water -- as in the BP spill. I can see the potential human error that happens then the engineer looks at two gauges and one reads that everything is OK. The difficulty of dealing with a problem may lead the engineer to assume -- wrongly -- that the gauge showing building pressure is the broken gauge. If the author of the book on the BP spill is correct, that judgment cost lives.

Rob Spiegel
User Rank
Blogger
Re: Network those things
Rob Spiegel   10/17/2013 11:35:06 PM
NO RATINGS
Good point Naperlou. A simple electronic signal -- setting off an alarm on the control side -- when the measurement goes into its red would seem enough, especially if it's backed up by scheduled visual checks to make sure the gauge is working.

Charles Murray
User Rank
Blogger
Re: It could blow up a plant
Charles Murray   10/17/2013 6:14:31 PM
I believe the 25% figure. As much as we at Design News write about modern, networked, electronics technology, we often forget that not every plant is so up to date. Sometimes, if there's no reason to replace something, it gets old, and when it gets old, it often breaks.

Ann R. Thryft
User Rank
Blogger
Re: No surprise.
Ann R. Thryft   10/17/2013 6:02:50 PM
NO RATINGS
25% seems like a relatively huge number, considering what kinds of warnings these gauges provide. That percentage might be high, seeing that it's from a company that makes gauges. OTOH, from what I've read many times, including in the comment sections to various DN articles, gauges in fact don't get monitored often enough, if at all. The BP Horizon example is perhaps the most dramatic recent one.

GTOlover
User Rank
Platinum
Re: It could blow up a plant
GTOlover   10/17/2013 2:39:22 PM
NO RATINGS
Rob, I agree with getting rid of gauges that are not used. But the usefulness of many gauges are not apparent until you have to diagnose and fix an issue with a piece of equipment or plant resource. This is also the time that maintneance guys find out that the gauges are broken or not working correctly.

Part of my strategy was to remove the gauges and place a quick-connect fitting in its place. Then when the need to view a gauge arose, pop one onto the fitting. However, I could see that in some enviroments (like chemical gases/liquids) this may not be appropriate. Also, it is really hard to install a hydraulic gauge onto a fitting under high pressure!

<<  <  Page 2/3  >  >>
Partner Zone
More Blogs
Some humanoid walking robots are also good at running, balancing, and coordinated movements in group settings. Several of our sports robots have won regional or worldwide acclaim in the RoboCup soccer World Cup, or FIRST Robotics competitions. Others include the world's first hockey-playing robot and a trash-talking Scrabble player.
Automation technology advances matched with expanded fracking and the growing urbanization of Asia, South America, and the Middle East, are fueling a boom in the automation industry.
In this engineering disaster, the Therac-25 radiation machine would go haywire, sending massive, sometimes fatal, radiation overdoses to patients.
A recent example of a major CAE revamp is MSC Apex, released last month by MSC Software Corp. In a discussion with Design News, MSC executives noted that its next-generation platform is designed to substantially reduce CAE modeling and process time, “in some cases from weeks down to hours.”
The Thames Deckway would run for eight miles close to the river’s edge, rising and falling slightly with the tidal cycle. It will generate its own energy from a series of devices that will line the pathway and use a combination of sources to make the path self-sustaining.
Design News Webinar Series
10/7/2014 8:00 a.m. California / 11:00 a.m. New York
9/25/2014 11:00 a.m. California / 2:00 p.m. New York
9/10/2014 11:00 a.m. California / 2:00 p.m. New York
7/23/2014 11:00 a.m. California / 2:00 p.m. New York
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
Oct 20 - 24, How to Design & Build an Embedded Web Server: An Embedded TCP/IP Tutorial
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  6


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Next Class: 10/28-10/30 11:00 AM
Sponsored by Stratasys
Next Class: 10/28-10/30 2:00 PM
Sponsored by Gates Corporation
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Sponsored Content

Technology Marketplace

Copyright © 2014 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service