A Broken Gauge Could Blow Up a Plant

NO RATINGS
1 saves
View Comments: Newest First|Oldest First|Threaded View
<<  <  Page 2/3  >  >>
Larry M
User Rank
Platinum
Re: No surprise.
Larry M   10/18/2013 12:09:01 PM
NO RATINGS
At the large manufacturing company where I have worked for 45 years, we have always had instrument calbration labs. Every piece of equipment has a sticker indicating when calibration is next due. Employees are not permitted to use equipment beyond the calibration due date or equipment which has bypassed the calibration lab.

Simply applying this process to gauges (and fitting a shut-off valve in series with each gauge) would solve this problem.

Rob Spiegel
User Rank
Blogger
Re: WIKA
Rob Spiegel   10/18/2013 11:24:26 AM
NO RATINGS
You're welcome, Car-Nut. This is an interesting subject, a weak spot at plants, and a dangerous weak spot at that.

Rob Spiegel
User Rank
Blogger
Re: It could blow up a plant
Rob Spiegel   10/18/2013 11:08:56 AM
NO RATINGS
That's right, Chuck. Gauges are usually mechanical, and thus they break. When they break, they don't stop anything. All you lose is your ability to monitor what is happening out of sight. But that could be critical.

Car-Nut
User Rank
Iron
WIKA
Car-Nut   10/18/2013 8:59:41 AM
NO RATINGS
As the Logistics manager for WIKA U.S., I must say it's nice to see an article about our organization. Thanks DN.

Rob Spiegel
User Rank
Blogger
Re: No surprise.
Rob Spiegel   10/17/2013 11:58:30 PM
NO RATINGS
I agree, Ann, you have to take the source of this data into consideration. But even if it's half of the 25%, it's significant. Wika also listed a handful of recent plant explosions and speculated they were caused by failed gaugues. Since it's just speculation, I left it out of the story. But it does make you think.

Rob Spiegel
User Rank
Blogger
Re: It could blow up a plant
Rob Spiegel   10/17/2013 11:52:27 PM
NO RATINGS
Yes, GTOlover, it's hard to replace a gauge under high pressure -- or, if the gauge is way below the water -- as in the BP spill. I can see the potential human error that happens then the engineer looks at two gauges and one reads that everything is OK. The difficulty of dealing with a problem may lead the engineer to assume -- wrongly -- that the gauge showing building pressure is the broken gauge. If the author of the book on the BP spill is correct, that judgment cost lives.

Rob Spiegel
User Rank
Blogger
Re: Network those things
Rob Spiegel   10/17/2013 11:35:06 PM
NO RATINGS
Good point Naperlou. A simple electronic signal -- setting off an alarm on the control side -- when the measurement goes into its red would seem enough, especially if it's backed up by scheduled visual checks to make sure the gauge is working.

Charles Murray
User Rank
Blogger
Re: It could blow up a plant
Charles Murray   10/17/2013 6:14:31 PM
I believe the 25% figure. As much as we at Design News write about modern, networked, electronics technology, we often forget that not every plant is so up to date. Sometimes, if there's no reason to replace something, it gets old, and when it gets old, it often breaks.

Ann R. Thryft
User Rank
Blogger
Re: No surprise.
Ann R. Thryft   10/17/2013 6:02:50 PM
NO RATINGS
25% seems like a relatively huge number, considering what kinds of warnings these gauges provide. That percentage might be high, seeing that it's from a company that makes gauges. OTOH, from what I've read many times, including in the comment sections to various DN articles, gauges in fact don't get monitored often enough, if at all. The BP Horizon example is perhaps the most dramatic recent one.

GTOlover
User Rank
Platinum
Re: It could blow up a plant
GTOlover   10/17/2013 2:39:22 PM
NO RATINGS
Rob, I agree with getting rid of gauges that are not used. But the usefulness of many gauges are not apparent until you have to diagnose and fix an issue with a piece of equipment or plant resource. This is also the time that maintneance guys find out that the gauges are broken or not working correctly.

Part of my strategy was to remove the gauges and place a quick-connect fitting in its place. Then when the need to view a gauge arose, pop one onto the fitting. However, I could see that in some enviroments (like chemical gases/liquids) this may not be appropriate. Also, it is really hard to install a hydraulic gauge onto a fitting under high pressure!

<<  <  Page 2/3  >  >>
Partner Zone
More Blogs
Enabling the Future is designing prosthetic appendages modeled more like superhero arms and hands than your average static artificial limbs. And they’re doing it through a website and grassroots movement inspired by two men’s design and creation in 2012 of a metal prosthetic for a child in South Africa.
In order to keep an enterprise truly safe from hackers, cyber security has to go all the way down to the device level. Icon Labs is making the point that security has to be built into device components.
Three days after NASA's MAVEN probe reached Mars, India's Mangalyaan probe went into orbit around the red planet. India's first interplanetary mission, and the first successful Mars probe launched by an Asian nation, has a total project cost of nearly $600 million less than MAVEN's.
Sega is releasing a new futuristic sandbox that uses height sensors and projection mapped projectors to cast pictures that correspond to what you're making.
Plant user interfaces are beginning to incorporate the consumer features such as swipe, double tap, and pinch. The driver is Millennials who expect plant equipment to match the sophistication of the smartphone.
Design News Webinar Series
9/25/2014 11:00 a.m. California / 2:00 p.m. New York
9/10/2014 11:00 a.m. California / 2:00 p.m. New York
7/23/2014 11:00 a.m. California / 2:00 p.m. New York
7/17/2014 11:00 a.m. California / 2:00 p.m. New York
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
Oct 20 - 24, How to Design & Build an Embedded Web Server: An Embedded TCP/IP Tutorial
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  6


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Next Class: September 30 - October 16
Sponsored by Littelfuse
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Sponsored Content

Technology Marketplace

Copyright © 2014 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service