2 New Nuclear Reactors Scheduled to Come Online in 2016

NO RATINGS
View Comments: Newest First|Oldest First|Threaded View
<<  <  Page 2/3  >  >>
bobjengr
User Rank
Platinum
NUCLEAR REACTORS AND 2016
bobjengr   7/17/2013 7:28:50 PM
NO RATINGS
I think these two reactors are much needed and I applaud the efforts of the state to work towards bringing back this important source of power.  In reality, I would hope we all agree a combination of energy sources will be necessary to fulfill our energy needs in the future.  I think it's absolutely shameful the United States of American does not have a viable energy policy.  Then again, we don't seem to get too much done in Washington these days.  Maybe the politicians will work that out over their MONTH-LONG August vacation. 

Ann R. Thryft
User Rank
Blogger
Re: Nuclear reactor
Ann R. Thryft   7/17/2013 1:18:47 PM
NO RATINGS
Solar IS replacing nuclear in California, aided by wind among other energy sources. The two San Onofre nuclear reactors have been permanently shut down, after being offline for 18 months. Although this is causing immediate concern for this summer's energy needs, solar in California, which leads the nation in that type of generation capacity, is gaining in leaps and bounds. For example, last month, the state's solar generation capacity broke the 2 GW barrier:
https://www.greentechmedia.com/articles/read/california-solar-breaks-the-two-gigawatt-output-mark
California's" goal of 33 percent renewables by 2020 has long been surpassed in Germany. Also, progress in interconnection technologies that tie renewables to the power grid are more advanced than some may realize:
https://www.greentechmedia.com/articles/read/California-Fast-Tracks-Renewable-Projects



Max23
User Rank
Iron
Re: Nuclear reactor
Max23   7/16/2013 10:44:22 PM
NO RATINGS
Flywheel technology has improved to give conventional storage technology a run for its money.  This Scientific America article details this up and coming tech.

 

http://www.scientificamerican.com/article.cfm?id=new-flywheel-design

ervin0072002
User Rank
Gold
Re: Nuclear reactor
ervin0072002   7/16/2013 9:42:45 PM
NO RATINGS
Solar cannot replace nuclear. some one made the comment that solar can replace nuclear with much less waste i believe. Reality is that the process to manufacture solar includes considerable polution and carbon footprint. and solar only works when the sun is up. hence energy storage is needed to be 100% self reliant.

Max23
User Rank
Iron
Re: Nuclear reactor
Max23   7/16/2013 7:32:56 PM
NO RATINGS
Thorium is part of the solution to help us deal with spent uranium from old tech reactors.

Safer, cheaper, and environmental positive.

 

http://gizmodo.com/this-thorium-reactor-has-the-power-of-a-norse-god-649185119

Jerry dycus
User Rank
Gold
Re: Nuclear reactor
Jerry dycus   7/16/2013 6:34:12 PM
NO RATINGS
Yet I get them at $80/kwhr down the street, 115amphr, 12.6vdc ones or 6.76vdc by 235amphrs retail.  Though I know what and how to buy well as I use them in my EV's too, a much harder app..

   And larger ones that utilities would use are even less/kwhr. Remember lead batteries last forever, you just have to reform them every 6-30 yrs depending on type and almost 100% recycled by law. 

 

But Ervin you never answered the question, why do utilities need them?  They haven't for over 100 yrs of variable supply/ demand, why now? 

 

Enquiring minds want to know?  Or have you been completely fooled by big energy propaganda?  

 

I get PennEnergy newsletters covering the whole/each  energy industry in detail sector by sector  every day including power generation.  Yet none have paid for a battery storage unit. And only a few others mostly paid for by grants.

Only one I know of that is needed at the end of a long rural powerline prone to blackouts where it pays it's way well especially since grants paid for it.

And only wind of RE is variable at all and it like others are predictable or on demand.  Take solar perfectly tracks A/C use and why I'll only need 1kw of PV to run my eff home's A/C for 25 yrs. And PV is now down to $780/kw-$.78/wt making it a bargain.

 

Is hydro or biomass variable? No they like concentrated solar thermal with very low cost storage are far more valuable, like PV solar and in cases of wind like on the east coast all are on demand or made when needed.

Again please tell me where all this lack of RE variability is an actual problem?

 

 

ervin0072002
User Rank
Gold
Re: Nuclear reactor
ervin0072002   7/16/2013 4:19:11 PM
NO RATINGS
Search a Online UPS system with batteries, installation and maintenance will come to the rough estimates i gave to you on the lower post

Jerry dycus
User Rank
Gold
Re: Nuclear reactor
Jerry dycus   7/16/2013 12:04:02 PM
NO RATINGS
Max ,  While thorium  looks very interesting we have way too much nuke waste that needs to be burned first, enough for 50 yrs of running new SMR's that burn it.

Unlike PWR's we have now that only use a few % of the fuel's energy that wastes so much and it needs to be recovered, used .

Max23
User Rank
Iron
Re: Nuclear reactor
Max23   7/16/2013 10:18:25 AM
NO RATINGS
Thorium must be considered as the replacement for existing uranium fueled reactor technology. http://energyfromthorium.com/ Safety and waste issues are at the top of the list for why it can (and should) replace uranium.

Jerry dycus
User Rank
Gold
Re: Nuclear reactor
Jerry dycus   7/16/2013 10:10:43 AM
NO RATINGS
Yet I buy storage for under $80/kwhr retail so just what are you talking about?  And many others are under $100/kwhr. 

 

But you ignore the fact that storage isn't needed as it's just a strawman argument creating a problem where there is none spread by big energy.

Facts are utility handle the way overblown RE varibility the same way it handles far more variable loads, No?

New NG cogens are almost all variable/throttleable meaning even more that no storage is needed, No?

So p lease tell me this great storage needs of RE? And why haven't utilities bought storage? The facts are they don't need it. Waiting to hear from you.

Nor have you mention the problems of not being able to shut down nukes to meet lower demand? 

Or the massive GW backup nukes need when they scram?  Why? How do they handle it?  And they scram fairly often. Enquiring minds want to know. 

 

 

<<  <  Page 2/3  >  >>
Partner Zone
More Blogs
Festo's BionicKangaroo combines pneumatic and electrical drive technology, plus very precise controls and condition monitoring. Like a real kangaroo, the BionicKangaroo robot harvests the kinetic energy of each takeoff and immediately uses it to power the next jump.
Design News and Digi-Key presents: Creating & Testing Your First RTOS Application Using MQX, a crash course that will look at defining a project, selecting a target processor, blocking code, defining tasks, completing code, and debugging.
These are the toys that inspired budding engineers to try out sublime designs, create miniature structures, and experiment with bizarre contraptions using sets that could be torn down and reconstructed over and over.
PowerStream is deploying the microgrid at its headquarters to demonstrate how people can generate and distribute their own energy and make their homes and businesses more sustainable through renewables.
Printrbot unveils its all-metal Printrbot Simple, bringing durability to low-cost 3D printers.
Design News Webinar Series
3/27/2014 11:00 a.m. California / 2:00 p.m. New York / 7:00 p.m. London
2/27/2014 11:00 a.m. California / 2:00 p.m. New York / 7:00 p.m. London
12/18/2013 Available On Demand
11/20/2013 Available On Demand
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
Apr 21 - 25, Creating & Testing Your First RTOS Application Using MQX
SEMESTERS: 1  |  2  |  3  |  4  |  5


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Next Class: April 29 - Day 1
Sponsored by maxon precision motors
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Sponsored Content

Technology Marketplace

Datasheets.com Parts Search

185 million searchable parts
(please enter a part number or hit search to begin)
Copyright © 2014 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service