Engineering Directives Not Followed... Again

NO RATINGS
View Comments: Threaded|Newest First|Oldest First
Nancy Golden
User Rank
Platinum
"Design Problems"
Nancy Golden   11/14/2012 9:56:58 AM
NO RATINGS
Amazing how many "design problems" are solved by going back and using the parts that were originally specified by the engineer...not surprising that this happened but you would think that with such an arduous task (that was a lot of wiring!) they would have checked first...

tekochip
User Rank
Platinum
Frightening
tekochip   11/14/2012 11:47:18 AM
It makes you worry about component substitutions in places that have not been detected......yet.

Ann R. Thryft
User Rank
Blogger
Re: Frightening
Ann R. Thryft   11/14/2012 12:52:23 PM
NO RATINGS
Wow, this really is scary. Presumably there were part numbers to choose from, so the contractors chose the wrong part number--why, to save money? Or because they really were incompetent? I can envision both. This makes me wonder about the general tendency I've heard of--and many have commented about on the DN site--to get less educated, less technically proficient people, who are also cheaper, to do supposedly less technical work--like installation--that supposedly doesn't require actual engineers since no actual engineering is involved.

GTOlover
User Rank
Platinum
Re: Frightening
GTOlover   11/15/2012 9:29:51 AM
I would also point out that contracters like to use a certain cash labor that has no cupability as they "ghost" away.

Cabe Atwell
User Rank
Blogger
Re: Frightening
Cabe Atwell   11/14/2012 12:53:38 PM
NO RATINGS
Having designed alarm, fire, and security systems, I have seen this type of work shirking in many places. Sometime they luck out, and it works ok. Then when the above story goes down, I get blamed. It's very stressful at times. Especially when the workers demand I sign off on their work.

C

 

Charles Murray
User Rank
Blogger
Re: Frightening
Charles Murray   11/14/2012 6:39:45 PM
NO RATINGS
My thought exactly, Tekochip. Unrecognized and unreported changes have a way of rearing their heads at the wrong time.

MarkRW
User Rank
Silver
Unapproved changes
MarkRW   11/15/2012 9:24:03 AM
When issues such as this (incorrect component, not following dwgs etc) arise I tell the persons involved to follow Mil-TFP-41 (Make it like the fine print for once) and let me know the results. Very often the problem goes away.

TunaFish#5
User Rank
Gold
i n c o n c e i v a b l e
TunaFish#5   11/15/2012 9:54:56 AM
NO RATINGS
They pulled 4km of the wrong cable.  When you got them to admit they did this on their own, they then tried to get you to sign a statement saying it was your fault?!?!?!?

How could anyone imagine getting you to sign such a paper in such a situation.

Choice words for these clowns are not suitable for this website.

bobjengr
User Rank
Platinum
DIRECTIVES NOT FOLLOWED
bobjengr   11/23/2012 10:56:28 AM
NO RATINGS
 

CABE-- It's amazing to me how many times in my engineering career I have seen requests for "variations" when specifications were not followed. I think some people (generally management and/or unions) feel we specify components, processes, etc just to fill the day until we clock out.  One thing that also scares me is product coming from vendors not on the "approved" list.   I was asked to investigate a component from a "new low-cost vendor"--completely unapproved by our company, to make sure they met the specifications and had UL approval.  In other words, I was asked to provide the "go-ahead" even if they were close. As it turned out, they were using child labor to manufacture the part; the part was NOT UL approve; the part had questionable fasteners from unapproved sources holding it together.  I said no--I could not approve the component.  In about 3 nanoseconds, I was called into the president's office.  We had what he referred to as a "come to Jesus" moment.   As it turned out, we had components being flown in to our facility, partial payment made and assembly lines waiting to produce.   The solution--take me off the project, put a younger engineer on the job and push ahead.  That's exactly what happened.  I left the company about three months later.    

Partner Zone
More Blogs
Festo's BionicKangaroo combines pneumatic and electrical drive technology, plus very precise controls and condition monitoring. Like a real kangaroo, the BionicKangaroo robot harvests the kinetic energy of each takeoff and immediately uses it to power the next jump.
Design News and Digi-Key presents: Creating & Testing Your First RTOS Application Using MQX, a crash course that will look at defining a project, selecting a target processor, blocking code, defining tasks, completing code, and debugging.
These are the toys that inspired budding engineers to try out sublime designs, create miniature structures, and experiment with bizarre contraptions using sets that could be torn down and reconstructed over and over.
PowerStream is deploying the microgrid at its headquarters to demonstrate how people can generate and distribute their own energy and make their homes and businesses more sustainable through renewables.
Printrbot unveils its all-metal Printrbot Simple, bringing durability to low-cost 3D printers.
Design News Webinar Series
3/27/2014 11:00 a.m. California / 2:00 p.m. New York / 7:00 p.m. London
2/27/2014 11:00 a.m. California / 2:00 p.m. New York / 7:00 p.m. London
12/18/2013 Available On Demand
11/20/2013 Available On Demand
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
Apr 21 - 25, Creating & Testing Your First RTOS Application Using MQX
SEMESTERS: 1  |  2  |  3  |  4  |  5


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Next Class: April 29 - Day 1
Sponsored by maxon precision motors
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Sponsored Content

Technology Marketplace

Datasheets.com Parts Search

185 million searchable parts
(please enter a part number or hit search to begin)
Copyright © 2014 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service