ab3a
User Rank
Platinum
Power Supplies: The Weakest Link
ab3a   5/4/2012 10:54:22 AM
NO RATINGS
It has been my experience as an end-user that the primary failure mode of most embedded microprocessors has been the power supply.

Back in the early 1990s it was fashionable to include calculations for MTBF with such gear. The numbers we were given were clearly ridiculous. I would routinely point out that these numbers were based upon heat, not component aging. Sure enough, about 12 years later we began seeing a very high high failure rate of our field devices. The cause was traced to... the power supplies.The electrolytic capacitors were failing.

Naturally, the were no longer in warranty, though the MTBF numbers would have suggested that they should have continued to be useful for many more years.

It's not just the issue of ripping designs from someone eles's homework. Power supplies are  one of the weakest links in keeping a system working. Remember that electrolytic capacitor scandal from around 2003? The lowly power supply deserves a great deal more attention than most engineers are willing to admit.

Jake Brodsky

Rob Spiegel
User Rank
Blogger
Re: Complex Systems Fail in Complex Ways
Rob Spiegel   5/2/2012 2:07:08 PM
NO RATINGS
Gsmith120, I would think that the practice of getting it done now and fixing it later is an expensive path. How long can a manager get away with that behavior before it comes to the attention of upper management and bean counters?

gsmith120
User Rank
Platinum
Re: Complex Systems Fail in Complex Ways
gsmith120   4/28/2012 7:35:02 PM
NO RATINGS
Nancy, I agree some people will never see the obvious.  As a senior engineer once told me "always remember pay me now or pay me later and if you pay me later it will cost you more".  That was one of things I hated about some decision makers they just wanted to get it done and worry about fixing it later.

Nancy Golden
User Rank
Platinum
Re: Complex Systems Fail in Complex Ways
Nancy Golden   4/24/2012 10:59:16 PM
NO RATINGS
I feel your pain, Eric. Sometimes it just doesn't make sense that people can't see the obvious...but it happens all the time. Effective cost reduction does not equal inferior quality and sometimes you have to pay more up front to save in the long run, but sometimes you just can't convince people of that. I am with you - I would prefer that they are someone else's customers!

Nancy Golden
User Rank
Platinum
Re: Complex Systems Fail in Complex Ways
Nancy Golden   4/24/2012 10:56:18 PM
NO RATINGS
You hit it right in the head, Rob - but you would be surprised at how much one can "scavenge" in a company that has been operating for years and has had a lot of test equipment designed and built. I remember on more than one occasion swapping power supplies around for that very reason...or IEEE cards, or memory...or video cards...sometimes we played "ring around the test set" to get the hardware specs we needed.

focusembedded
User Rank
Iron
Re: Complex Systems Fail in Complex Ways
focusembedded   4/24/2012 3:28:13 PM
NO RATINGS
Nancy --

Yours was a problem I saw all the time when I was in the development tools business.  The only companies I've encountered where this issue isn't endemic are those where somebody takes the time, on a module by module basis, to write up a spec sheet for what the module in question will and won't do.  Then there's a chance that somebody can produce the document that says, "This won't do that" when his boss says, "Just reuse this old design."  That, I think, is more a comment on human psychology.  But it seems critical that the entire conversation be reframed in the context of, "What changes do we have to make to the existing design in order to make it appropriate for the new design?"  Asking that question assures that the matter is at least addressed, and if the answer is, "So many changes it'd be easier to start over with a clean sheet of paper," that message can be taken to management with some chance of success.

Nowadays I'm out of the development tools business, but it's not as though I don't reguarly see our potential client companies doing exactly what these heavy equipment people did -- largely because management gets it in its head that everything is infinitely reusable unless there's some internal procedure for triggering a review of "reusability" and some kind of document that says, "Ah...  Come to think of it...  No, not at all."

Note that above I say, "potential client companies," and not, "actual clients."  Because where this kind of cavalier behavior is standard practice, it's usually because the company in question is penny wise and pound foolish.  Running, as I do, a high-end design shop where we have a total *value* proposition instead of a message that "we compete strictly on price," I like for the self-selection algorithms for our customers to run in such a way that the guy who regularly reuses too much to "save money" is somebody else's client -- not ours.

It wasn't *that* long ago that we turned away a client who refused to spend the money to buy an extra week of engineering time in order to figure out how to make his system run better with about half as many components in it.  Had he only been building a handful of units a year, not spending the NRE dollars would have made sense.  But he was bulding 15,000 units a year, and 40 hours of engineering time would have saved $8 of BOM cost on every one of them.  When you do the math, in one year, he'd have saved $120,000 (and had a more reliable end product, since it'd have fewer things in it to break).  Or dividing it through anohter way, for NRE costs to have outweighed BOM cost savings, I'd have had to have been charging him more than $3,000 an hour for engineering time.  And as much as I think Focus Embedded is a really good shop with the best product in the business, that rate is a tad high even for us...  ;-)

-- Eric Overton

Rob Spiegel
User Rank
Blogger
Re: Complex Systems Fail in Complex Ways
Rob Spiegel   4/18/2012 12:57:37 PM
NO RATINGS
Interesting story, Nancy. I would imagine that in certain critical areas -- like power supply -- you still had to test to make sure the existing design would work with the new features. That's the odd part about of this story.

Nancy Golden
User Rank
Platinum
Re: Complex Systems Fail in Complex Ways
Nancy Golden   4/18/2012 11:29:20 AM
NO RATINGS
From my experience, Rob - I think you are correct in it happening all of the time. I look back at some of the test equipment that I worked on that was 15 years old and still expected to meet current test needs. The engineer was expected to add to the design to meet new needs rather than redesign the test set - all in an effort to save money. Every once in awhile we could shake our heads and go "no way, this just won't work" and get to do a total redesign - but that didn't happen very often. If it actually compromised the integrity of the product then we would insist on a redesign, but of course with the economy and lay offs being a fact of life back then - we didn't complain too loudly if we could make it work and it was "good enough." We did the best we could "within the parameters we were given."

Rob Spiegel
User Rank
Blogger
Re: Human problem
Rob Spiegel   4/17/2012 2:37:15 PM
NO RATINGS
Yes, I think you're right, Chuck. The design engineering staff turns over and the new person simply adjust the existing design to accommodate (though not really accommodating) the new features. Then time-to-market come in as a pressure on design. The features keep getting added on to the old design until the design breaks down.

wbswenberg
User Rank
Gold
Software Executing without Power
wbswenberg   4/13/2012 11:31:59 AM
NO RATINGS
I worked with aerospace software design engineers that expected their software to execute without power.  In fact they specifically designed software for this condition.  When there is the loss of electrical power in an airplane, which can happen any time, for a number of reasons, the electronic box needs to sense this and the software needs to execute shutdwon code for the few seconds left on the caps. Probably all data should be in nonvolatile memory all the time (but usually is not done that way), not registers.

When the electonic box starts up it needs to determine stable staus as soon as possible.  Some times knowing the last state is at least somewhat helpfull.  But again the box will not know the state that it is being power up in.  There are some boxes on the airplane that get enought of the right kind of information to determine the mode of the airplane; ground power, engine power, taxi, climb, cruise, decent and land. 

I had a running debate of the importance of immediately determining the present non-intermitent state of the box inputs so valid condition may be reported.  The project manager insited in following series flight mode "states".  They are sill having trouble because of this false series progression.

Page 1/3  >  >>
Partner Zone
More Blogs from Sherlock Ohms
Sherlock Ohms highlights stories told by engineers who have used their deductive reasoning and technical prowess to troubleshoot and solve the most perplexing engineering mysteries.
Sherlock Ohms highlights stories told by engineers who have used their deductive reasoning and technical prowess to troubleshoot and solve the most perplexing engineering mysteries.
Sherlock Ohms highlights stories told by engineers who have used their deductive reasoning and technical prowess to troubleshoot and solve the most perplexing engineering mysteries.
Sherlock Ohms highlights stories told by engineers who have used their deductive reasoning and technical prowess to troubleshoot and solve the most perplexing engineering mysteries.
Sherlock Ohms highlights stories told by engineers who have used their deductive reasoning and technical prowess to troubleshoot and solve the most perplexing engineering mysteries.
Design News Webinar Series
10/7/2014 8:00 a.m. California / 11:00 a.m. New York
9/25/2014 11:00 a.m. California / 2:00 p.m. New York
9/10/2014 11:00 a.m. California / 2:00 p.m. New York
7/23/2014 11:00 a.m. California / 2:00 p.m. New York
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
Oct 20 - 24, How to Design & Build an Embedded Web Server: An Embedded TCP/IP Tutorial
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  6


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Next Class: 10/28-10/30 11:00 AM
Sponsored by Stratasys
Next Class: 10/28-10/30 2:00 PM
Sponsored by Gates Corporation
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Sponsored Content

Technology Marketplace

Copyright © 2014 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service