HOME  |  NEWS  |  BLOGS  |  MESSAGES  |  FEATURES  |  VIDEOS  |  WEBINARS  |  INDUSTRIES  |  FOCUS ON FUNDAMENTALS
  |  REGISTER  |  LOGIN  |  HELP
Blogs
Guest Blogs

Favorable Economics & Strong Design Boost American Manufacturing

NO RATINGS
< Previous Page 2 / 2
View Comments: Oldest First|Newest First|Threaded View
Rob Spiegel
User Rank
Blogger
Energy benefit hasn't hit yet
Rob Spiegel   7/17/2013 10:19:12 AM
NO RATINGS
Nice article, Michelle. You hit on all of the points that are enhancing U.S. manufacturing. You mentioned lower energy costs due to shale oil. That part hasn't hit yet. While new oil is coming onto the market from fracking, it hasn't hit the volume needed to drive down energy costs, which are still set by world demand. But it will. Right now the energy savings seen at plants has to do with efficiency. Over the next few years, new oil and new natural gas from fracking will begin to make a difference in the cost of energy. But it hasn't hit yet. When it happens, you'll see the effect at the pump.

naperlou
User Rank
Blogger
Integrating engineering and manufacturing
naperlou   7/17/2013 11:50:25 AM
NO RATINGS
I really like the GE water heater example.  I am old enough to have gone through the TQM types of programs where the whole team was brought together, including engineering, manufacturing and field engineering.  At one company I was assigned a field engineer to do programming.  The idea was that, since he was involved in the development of the product, he would be better placed to install, upgrade and maintain it.  He also provided valuable information about what we were doing and helped us avoid designs that would be hard to maintain. 

 

Then things went offshore.  Companies lost control.  I have worked over the last few years on companies that were going out of business becuase of mistakes made by foreign suppliers.  These were small companies.  Few could be saved.  What I found interesting, though, was that one of my small company situations was exactly similar to a large company in the same basic business.

 

As for efficiency in China, just look at Foxconn.  I have heard that they have 1.2M workers.  What!! Does anyone think that this is efficient?  I am not worried. 

 

One other thing.  Those low end industries that the US "gave up" were in some cases where we were the biggest exporters (e.g., textiles).  We gave those industries up for geopolitical reasons.  In fact, that is why most of our industrial issues have arrisen. 

 

If you look at manufacturing in the US, much of it is owned my foreign companies.  Many German and Japanese companies manufacture here.  And their presence is growing. 

TJ McDermott
User Rank
Blogger
Geospring made offshore first?
TJ McDermott   7/18/2013 12:50:29 AM
NO RATINGS
Michelle, I'm confused about the sequence of events concerning the Geospring.  Your article states GE brought it back to the US.  I took this to mean it WAS being manufactured in China.

If the US fabricators thought the tubing at the top was such a mess, how did the Chinese fabricators make it?

 

Ann R. Thryft
User Rank
Blogger
Re: Integrating engineering and manufacturing
Ann R. Thryft   7/18/2013 1:46:52 PM
NO RATINGS
Thanks for the information. I found it especially interesting to read about gaps in communication between American design engineers and Chinese manufacturers. Perhaps that gap, and the problems it causes, are behind so many of the problematic products we've discussed in comments to many Made by Monkeys and Sherlock Ohms columns. Like Lou, I also remember TQM.

bobjengr
User Rank
Platinum
AMERICAN MANUFACTURING
bobjengr   7/19/2013 10:39:43 AM
NO RATINGS
Excellent post Michelle.  I retired from a GE company; i.e. Roper Corporation, Inc and I can state, at one time, all engineers and purchasing people had as a mandate, to specify and purchase 30% of all components from LCCs (low cost countries).  We all felt this was a real bummer and limited our choices considerably.  As you mentioned in your post, the tide is turning.  There are other reasons for this, namely:

1.) Quality for "commodity" components drops considerably after first piece inspections are performed. It is a MUST that incoming inspections be performed to "cull out" off-quality merchandise.

2.) Communications, no matter what anyone tells you, is an ongoing problem.

3.) The speed at which product and component revision can be made is definitely lessened due to "products on the water".  It is very difficult to achieve the number of turns on inventory without creating obsolescence.

4.)  Geopolitical issues and instability. (Depending upon the product, there are definitely issues with national security.  )

5.)  I do suspect vendors in China can count even though it is not uncommon to order 10 and get 8.  This is an ongoing problem also. 

In my opinion, if we had a government that would keep out of our way, manufacturing could once again be the cornerstone of an economic rebound in this country.  This can be accomplished with good environmental policies in place in spite of what you hear.  Again--excellent post.

Partner Zone
More Blogs from Guest Blogs
Manufacturers of plastic parts recognize the potential of conformal cooling to reduce molding cycle times. Problem is, conformal molds require additive manufacturing (AM), and technologies in that space are still evolving. Costs also can be high, and beyond that, many manufacturing organizations lack the knowledge and expertise needed to apply and incorporate additive technologies into their operations.
Machine vision and video streaming systems are used for a variety of purposes, and each has applications for which it is best suited. This denotes that there are differences between them, and these differences can be categorized as the type of lenses used, the resolution of imaging elements, and the underlying software used to interpret the data.
In the face of growing challenges for embedded technology engineers, designers should actually be designing for a new IoT -- the Internet of Tomorrow.
As today’s product design cycles are held to tighter schedules and budget constraints, it’s becoming even more critical to consider human factors up front to catch and fix problems during the initial development stages, when it’s faster and less costly to do so. Overlooking human factors at the beginning of the design cycle could lead to poor user experience, a decrease in effective product performance, and an increase in safety risk to the user.
Plastic part manufacturers are always looking for ways to reduce cycle time and get more productivity out of their injection molding machinery. One of the longstanding constraints in injection molding production has been cooling time. Removing parts from the mold before they have cooled induces warping or shrinking. But wait time works against productivity.
Design News Webinar Series
3/31/2015 11:00 a.m. California / 2:00 p.m. New York
2/25/2015 11:00 a.m. California / 2:00 p.m. New York
12/11/2014 8:00 a.m. California / 11:00 a.m. New York
5/7/2015 11:00 a.m. California / 2:00 p.m. New York
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
May 4 - 8, Designing Low Power Systems using Battery and Energy Harvesting Energy Sources
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  6 |  7


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Last Archived Class
Sponsored by Proto Labs
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Sponsored Content

Technology Marketplace

Copyright © 2015 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service