HOME  |  NEWS  |  BLOGS  |  MESSAGES  |  FEATURES  |  VIDEOS  |  WEBINARS  |  INDUSTRIES  |  FOCUS ON FUNDAMENTALS
  |  REGISTER  |  LOGIN  |  HELP
Blogs
Guest Blogs

Update: Racing in Bridgestone's 2013 Solar World Challenge

NO RATINGS
View Comments: Oldest First|Newest First|Threaded View
GTOlover
User Rank
Platinum
Good job on finishing!
GTOlover   10/17/2013 9:35:47 AM
NO RATINGS
I checked the results and your team should be proud! You finished the race driving your solar vehicle. I saw that many participants had to trailer their vehicle. Nothing like a little real world challenges to better the engineering students. Your team will be better engineers from this experience.

Good Job!

Rob Spiegel
User Rank
Blogger
Re: Good job on finishing!
Rob Spiegel   10/17/2013 10:21:39 AM
NO RATINGS
This is a great story of picking yourself up, dusting yourelf off, and continuing the race. This would make a great movie, much like Cool Runnings.

naperlou
User Rank
Blogger
Re: Good job on finishing!
naperlou   10/17/2013 12:31:05 PM
NO RATINGS
Great story. Crashing and fixing race cars is a time honored tradition.  That your car could be fixed in the field is a good indicator of the design.  I am sure that you all had lots of fun as well, and you will have some good stories to tell at the pub.

Rob Spiegel
User Rank
Blogger
Re: Good job on finishing!
Rob Spiegel   10/17/2013 3:37:57 PM
NO RATINGS
From GTOlovers report on the event, it looks like there are a number of contestants that have pub stories to tell. Wonderful things can come from contests like this.

Charles Murray
User Rank
Blogger
Congrats
Charles Murray   10/17/2013 6:29:56 PM
NO RATINGS
Congratulations on building the car and finishing the race, Pavan. As GTOlover stated in his comment, there's nothing like a real-world challenge to improve your engineering skills.

GTOlover
User Rank
Platinum
Re: Good job on finishing!
GTOlover   10/18/2013 1:31:18 PM
NO RATINGS
Here are the results for the Challenger class:

http://www.worldsolarchallenge.org/files/492_final_results_sunday_challenger_class.pdf

Yes, there will be stories to tell from all the teams! Some good, some bad, some funny, some sad.

Charles Murray
User Rank
Blogger
Re: Good job on finishing!
Charles Murray   10/18/2013 6:22:21 PM
NO RATINGS
Yes, naperlou, crashing and re-building is a time-honored tradition. I've always liked a comment from Gordn Moore, co-founder of Intel, about what is learned from such efforts: "With engineering, I view this year's failure as next year's opportunity to try it again. Failures are not something to be avoided. You want to have them happen as quickly as you can so you can make progress rapidly."

Pubudu
User Rank
Platinum
Re: Good job on finishing!
Pubudu   10/19/2013 1:32:45 PM
NO RATINGS
There are many bad stories which will bring more experience, behind all the good stories.
Passion and teamwork will take you all to the top for sure, Good Luck.

Partner Zone
More Blogs from Guest Blogs
Machine vision and video streaming systems are used for a variety of purposes, and each has applications for which it is best suited. This denotes that there are differences between them, and these differences can be categorized as the type of lenses used, the resolution of imaging elements, and the underlying software used to interpret the data.
In the face of growing challenges for embedded technology engineers, designers should actually be designing for a new IoT -- the Internet of Tomorrow.
As today’s product design cycles are held to tighter schedules and budget constraints, it’s becoming even more critical to consider human factors up front to catch and fix problems during the initial development stages, when it’s faster and less costly to do so. Overlooking human factors at the beginning of the design cycle could lead to poor user experience, a decrease in effective product performance, and an increase in safety risk to the user.
Plastic part manufacturers are always looking for ways to reduce cycle time and get more productivity out of their injection molding machinery. One of the longstanding constraints in injection molding production has been cooling time. Removing parts from the mold before they have cooled induces warping or shrinking. But wait time works against productivity.
Editor’s Note: This is part 1 of an in-depth look at six added-value opportunities -- adjacent to the aluminum extrusion option -- that OEMs can integrate to upgrade supply chain interactions from basic buyer-vendor transactions to critical collaborations on strategic, single-source solutions.
Design News Webinar Series
3/31/2015 11:00 a.m. California / 2:00 p.m. New York
2/25/2015 11:00 a.m. California / 2:00 p.m. New York
12/11/2014 8:00 a.m. California / 11:00 a.m. New York
5/7/2015 11:00 a.m. California / 2:00 p.m. New York
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
May 4 - 8, Designing Low Power Systems using Battery and Energy Harvesting Energy Sources
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  6 |  7


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Last Archived Class
Sponsored by Proto Labs
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Sponsored Content

Technology Marketplace

Copyright © 2015 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service