HOME  |  NEWS  |  BLOGS  |  MESSAGES  |  FEATURES  |  VIDEOS  |  WEBINARS  |  INDUSTRIES  |  FOCUS ON FUNDAMENTALS
  |  REGISTER  |  LOGIN  |  HELP
Blogs
Guest Blogs

Automated Requirements Traceability & Verification of Software: Who Cares? I Do

NO RATINGS
View Comments: Oldest First|Newest First|Threaded View
Beth Stackpole
User Rank
Blogger
PLM can play a role
Beth Stackpole   10/25/2012 7:30:32 AM
NO RATINGS
With embedded systems an important part of all types of products, even mainstream consumer household goods, the software piece of development plays an increasingly important role so you are absolutely right that the entire development team needs to care--not just the software guys.

Unfortunately, automated requirements traceability and vertification of code, if practiced at all, is typically performed in a separate system that has little to no integration with the other primary engineering systems like PDM, CAD, and ECAD. Sensing the need and spying opportunity, most of the leading PLM vendors have made it a priority to change that scenario, either acquiring or building out requirements and traceability functionality as part of their integrated PLM suites.

 

naperlou
User Rank
Blogger
Re: PLM can play a role
naperlou   10/25/2012 10:54:31 AM
NO RATINGS
Beth, you are correct.  Tools that pull in all requirements and information across the system can be a real differentiator.  I "grew up" in the aerospace industry (primarily space).  We put a lot of effort into requirements, traceability and testing, of course.  In the early days much of what we had was home grown.  The projects were big enough that this was not an issue.  After getting out into the commercial world, I was appaled at the lack of requirements traceability and the risky situations companies put themselves in when developing products. 

With the new standards mentioned by Jim in the article, it is no longer sufficient to handle requirements manually in many areas.  I recall a discussion on Embedded.com on certification of engineers in the areas mentioned being required at some point.  That is how critical software and requirements traceability is. 

Beth Stackpole
User Rank
Blogger
Re: PLM can play a role
Beth Stackpole   10/26/2012 7:27:42 AM
NO RATINGS
That scenario you describe, Naperlou, is definitely spot on with what I've continually heard from engineers and industry folk. Siloed, oftentimes, proprietary and custom-built systems that have little integration with the rest of the engineering tool suite. I think while the aerospace companies might still use their proprietary systems (afterall, they've made a huge investment), many other companies, including automotive makers, are branching out into the requirements traceability function as part of a broader PLM effort.

Greg M. Jung
User Rank
Platinum
Effective Requirements
Greg M. Jung   11/4/2012 3:45:55 PM
NO RATINGS
Yes, I agree that defining effective requirements is key to a successful project launch.  With products and systems becoming more and more complex, it seems that the majority of my time is used to properly gather, define, adjust and trace project requirements.  I expect this trend to continue to grow as system complexity continues to increase.

Partner Zone
More Blogs from Guest Blogs
In November, a European space probe will try to land on the surface of a comet moving at about 84,000 mph and rotating with a period of 12.7 hours. Many factors make positioning the probe for the landing an engineering challenge.
Mistakes in power distributions are not all that common, but they do exist. We look at some of these mistakes and disaster scenarios with the intention being to inform readers to be wary of repeating such mistakes when designing their power distribution system.
What do gears, bearings, and shafts have in common? For one thing, they're often made out of steel. For another, they're subject to a failure mode known as rolling contact fatigue.
The Smart Emergency Response System capitalizes on the latest advancements in cyber-physical systems to connect autonomous aircraft and ground vehicles, rescue dogs, robots, and a high-performance computing mission control center into a realistic vision.
Businesses cutting across industries are increasingly making use of portable display stands in the UK for marketing.
Design News Webinar Series
9/10/2014 11:00 a.m. California / 2:00 p.m. New York
7/23/2014 11:00 a.m. California / 2:00 p.m. New York
7/17/2014 11:00 a.m. California / 2:00 p.m. New York
6/25/2014 11:00 a.m. California / 2:00 p.m. New York
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
Sep 22 - 26, MCU Software Development – A Step-by-Step Guide (Using a Real Eval Board)
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  6


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Next Class: September 30 - October 2
Sponsored by Altera
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Sponsored Content

Technology Marketplace

Copyright © 2014 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service