HOME  |  NEWS  |  BLOGS  |  MESSAGES  |  FEATURES  |  VIDEOS  |  WEBINARS  |  INDUSTRIES  |  FOCUS ON FUNDAMENTALS
  |  REGISTER  |  LOGIN  |  HELP
Blogs
Guest Blogs

Reducing Risk Through Integrated Advanced Development

NO RATINGS
Page 1 / 2 Next >
View Comments: Newest First|Oldest First|Threaded View
<<  <  Page 2/2
Alexander Wolfe
User Rank
Blogger
Re: The 5% rule
Alexander Wolfe   3/6/2012 6:32:24 PM
NO RATINGS
For most companies, five percent devoted to assessment is a more manageable and realistic goal than the 20% that Google supposedly allows employs to devote to researching stuff that's not part of their job. At the same time, even 5% is a lot in the high-pressure, fast time-to-market, lower headcount world many of us work in. Let's hope they take your advice, Bill.

Charles Murray
User Rank
Blogger
The 5% rule
Charles Murray   3/6/2012 6:03:49 PM
NO RATINGS
Nice article. The 5% recommendation for advanced development time is reminiscent of the old (maybe it's still exists) 10% rule at 3M. As I recall, 3M actually used to allow engineers to set aside 10% of their time to work on any kind of development (advanced or otherwise). I believe that's how Post-It Notes were created.

Dave Palmer
User Rank
Platinum
Re: It boils down to process improvement
Dave Palmer   3/6/2012 4:22:33 PM
NO RATINGS
Bill, I hope companies will pay attention to your recommendation that engineers should be spending 2 - 3 hours a week on advanced development activities.   It's absolutely essential for engineers to stay on top of the latest technology -- as much for their own good as for the good of their employers.  And it's essential to do your homework before embarking on a new project.  To a large extent, the success of a project is determined before the project starts.  The best solution is a continuous commitment to advanced development.

Bill Devenish
User Rank
Blogger
Re: It boils down to process improvement
Bill Devenish   3/6/2012 10:39:26 AM
NO RATINGS
Beth, thank you for your comments.  You have highlighted another topic that I will be writing about soon, and that is the tendency for development teams to stick with only one design concept, which creates a ripple effect of difficulties in later stages of the project.

Beth Stackpole
User Rank
Blogger
It boils down to process improvement
Beth Stackpole   3/6/2012 8:01:07 AM
NO RATINGS
I think Bill shines some light on a big issue that doesn't get the due it deserves in terms of advancing the cause of more effective, more efficient product development. Process improvement is one of those necessary evils that people love to gloss over, particularly engineers who often want to cut to the chase of tinkering with and discovering new innovations without being burdened by what they see as boring, institutional boilerplate.

In reality, that mentality couldn't be more wrong. Bill lays out the very strong case for instituting processes within engineering that not only enourage and promote the exploration of advanced technologies throughout the entire engineering team, but also to do so early on in the cycle so potential problems and potential better solutions are found earlier, rather than later when it is too late and far too expensive to make changes.

<<  <  Page 2/2
Partner Zone
More Blogs from Guest Blogs
It seems that gears have been around forever -- what could be new?
The use of ZNE technology buildings not only reduces cost and creates renewable energy, but it can give a boost to the economy. The implementation and execution will require a workforce, which means the result can be increased employment.
The use of CFD is more profound in automobile design because of the diverse physics involved. It can be used to optimize components for downsizing and reducing the environmental footprint while maintaining or improving operational efficiency.
A Detroit automaker was struggling with a semi-manual, labor-intensive parts receiving process. Workers had enter parts into a spreadsheet manually at a stationary workstation. This stopped the receiving process dead in its tracks. A better system was needed.
Pressure sensors can be used in a wide range of applications. It’s imperative that they’re suited for use in hazardous situations and are fully compliant with one of several protection standards.
Design News Webinar Series
7/23/2014 11:00 a.m. California / 2:00 p.m. New York
7/17/2014 11:00 a.m. California / 2:00 p.m. New York
6/25/2014 11:00 a.m. California / 2:00 p.m. New York
5/13/2014 10:00 a.m. California / 1:00 p.m. New York / 6:00 p.m. London
Quick Poll
The Continuing Education Center offers engineers an entirely new way to get the education they need to formulate next-generation solutions.
Aug 4 - 8, Introduction to Linux Device Drivers
SEMESTERS: 1  |  2  |  3  |  4  |  5  |  6


Focus on Fundamentals consists of 45-minute on-line classes that cover a host of technologies. You learn without leaving the comfort of your desk. All classes are taught by subject-matter experts and all are archived. So if you can't attend live, attend at your convenience.
Next Class: August 12 - 14
Sponsored by igus
Learn More   |   Login   |   Archived Classes
Twitter Feed
Design News Twitter Feed
Like Us on Facebook

Sponsored Content

Technology Marketplace

Copyright © 2014 UBM Canon, A UBM company, All rights reserved. Privacy Policy | Terms of Service