I work in a rather large organization and we typically rely on a scheduling department to prepare our formal program schedules and task linkage charts. The process works like this: engineering prepares the program's task list, task duration, start and stop dates, and identifies which tasks are dependent upon other tasks (i.e., task 5 cannot start until after task 3 is completed).
With their extensive scheduling knowledge and experience, the people who run our scheduling department have identified some pitfalls they can expect whenever they're forced to rely upon engineering to provide specific task dates for a program. These traditional pitfalls include:
Scheduling work on weekends and holidays
Scheduling more than 28 days in February, or more than 30 for April, June, September
Leaving some tasks open until after the program's end date
Mis-scheduling tasks or scheduling serial tasks in parallel
Ordering parts after final assembly operations are complete
Releasing design drawings after manufacturing on those parts has started
After the scheduling guys locate and resolve all of these 'traditional' scheduling nightmares is when the fun starts. You see, there are a couple of people in the engineering department who see it as their job to inject some humor into our otherwise dreary existence. These people have devised a set of scheduling methods to communicate hidden messages through these program schedules, and to keep the mood from getting too serious. The favorite technique is to select specific dates for key program milestones. Some that have shown up most often include:
Major Program Review on December 7 (Bombing of Pearl Harbor)
Program Status Update on April 1 (April Fool's Day)
Completion of Key Event on Program Manager's Birthday
Program Cost and Schedule Review on Friday the 13th Engineering Design/Drawing Completion on July 4 (Independence Day)
You get the idea, but you'd be surprised at just how many schedule dates are created in this manner.
When you use this type of date scheduling, you'll find that you soon run out of major events to use, and that's when you need to dig down and get really creative. You'll need to check out calendars wherever you find them because each calendar seems to have its own unique list of holidays and historically significant dates. My personal favorite has been to start using Canadian and English calendars as they provide more non-traditional holidays than our typical U.S. office supply calendars. A couple key dates in the Canadian calendar include Victoria Day and Boxing Day. The English calendar has Guy Fawkes Day and the Queen's Birthday. Other notable and very worthwhile dates in our U.S. calendars include: March 17 (St. Patrick's Day), April 25 (Secretaries Day), October 8 (Columbus Day), and October 31 (Halloween). However, considering what happened to Bill Murray, February 2nd might be a good one to steer clear of!
Some of the more memorable things that we've had scheduled include: Customer meetings on Valentine's Day, 12 hour work day on June 21 (longest day of the year), 6 hour work day on December 21, Problem Reports due on June 14 (red) flag day, Test completion date on Thanksgiving Day, and Official Test Validations scheduled on June 6 (D-Day).
Even with the limited 225 year history of the U.S., there seems to be an endless supply of historically significant dates that can be used to schedule your program. And the more obscure the date or its reference, the more likely you are not to have anyone object to your use of the date in the master schedule. Some of these more obscure events and dates include: Custer's Last Stand, Lincoln's Gettysburg Address, Election Day, Date of the Academy Awards or Oscars, and there's always March 14 because it's the closest date to Pi.
This report is one of a series of occasional columns exploring the not-altogether-serious side of engineering by Ken Foote, a mechanical engineer at GDLS. You can reach Ken atfootes@chartermi.netor email your comments to us atkfield@cahners.com.
If the half-life of a certain radioactive isotope is 8.6 days, approximately how long will it take to decay to 1.0 percent of the original amount?
A) 29 days
B) 57 days
C) 66 days
D) 86 days
E) 860 days
See answer below. Adapted from the Fundamentals of Engineering Examination, Eugene L. Boronow, Prentice Hall Press, 1986. The worked out solutions to all Headwork problems can be found on our website at www.designnews.com. Under "Engineering Resources" on the left hand nav bar click on "Breaktime."
JUNE 26TH WEBCAST: Collaborative Requirements Engineering
Speed your innovation. Capture the "voice of the customer" and translate customer requests into user requirements that define new products. Find out why the new ENOVIA Requirements Management solution enables organizations to improve their overall global requirements management process. Read More
Mechatronics in action
Successful synergistic integration of controls, electronics, computers and mechanical systems is key to the 21st century design process. Unlock the secrets at the Mechatronics Zone!
Webcast: Sensor Know-How Now
Join our moderator Randy Frank and John Keating from Cognex and explore Solving Industrial Inspection Problems. Read More
Engineering Concept Conduit
Engineering Concept Conduit looks at new products and the components that make them exceptional. Each month we’ll look at a new electronic product and see what makes it tick from an engineering point of view. We’ll explore the design and engineering challenges for the product and examine the components that solved those challenges.
Light Matters: Systems Level Approach to HBLED illumination applications
Its good practice to apply a systems-level approach to high-brightness LED (HBLED) illumination applications. Minimally, the system includes the optical, thermal and electrical characteristics of the of the HBLED, the lens (if any) which is built-in to its package, secondary optics such as external plastic lenses/reflectors to direct the light as your application requires and power driver electronics. Read More