ADVERTISEMENT
You will be redirected to your destination in 10 seconds.
Electronics Industry Search

Polling Question

Should the government bail out U.S. automakers?

  • Yes
  • No



View Previous Poll Results
Advertisement
Email
Print
Reprints/License
RSS
Article tools sponsored by

Video tour shows Boeing C-17 plant

by Louise Elliott, Regional Editor -- Design News, February 4, 2002


In the final stages of assembling the C-17 Globemaster III engines and flaps go on the huge aircraft. This assembly bay is 202 feet wide and 780 feet long.

Long Beach, CA—Assembly Expo West planned to highlight the Nov. 14-15 show with a site tour of Boeing's Long Beach facilities for assembling the huge C-17. But in view of continuing terrorist threats, Boeing had to cancel the physical tour, and instead offered attendees a video walkthrough of the 1.1 million ft2 plant.

The U.S. Air Force/Boeing C-17 Globemaster III is currently being used for food drops into Afghanistan, as well as for other, classified, purposes in the war against terrorism. The plane is a high-wing, four-engine, T-tailed aircraft with a rear loading ramp, described as the largest opening ever designed in a pressurized aircraft, that can be used to deliver tanks and troops to battlefields.

Although the aircraft doesn't represent new technology—the first C-17 having flown in 1991—Boeing has made great technical strides on the manufacturing side, cutting the time to assemble a C-17 from 1.3 million hours for the first plane, to about 200,000 hours today.

The company has cut costs in manufacturing and assembling C-17s as well. Self-sealing fasteners, for example, save about $2 million per plane, according to David Eastman, business development representative for Boeing. He says that Boeing has instituted other cost saving manufacturing processes, and that accelerated improvement workshops have resulted in savings of between $9 and $12 million over the past three years.

Measuring 174 ft in length, the C-17 is 55.08 ft high, with a wingspan of 169.75 ft. The plane weighs 280,000 lbs empty, and can carry 84 tons of cargo. With a payload of 160,000 lbs, the plane can take off in 7,600 ft airfield, fly 2,400 nautical miles, and land on a small, austere airfield within 3,000 ft.

Between 80% and 85% of its assembly takes place in the Long Beach plant. Boeing has a contract to supply the Air Force with 120 of them through 2004, and recently got a contract to supply four C-17s to the United Kingdom.

Advertisement

Sponsored Content

Technology Marketplace

Email
Print
Reprints/License
RSS
Article tools sponsored by
Find a supplier on oemsuppliersearch.com

Talkback


We would love your feedback!


» Submit talk back
Advertisement
Advertisement

Design News Partner Zones

AnarkCAD/CAE Model Clean-Up: Reduce Iterative Cycles
This webinar featured research and survey results related to problems associated with preparing CAD geometry for CAE applications.  We discussed how Recipe-Based Automation can help create "just-in-time" CAE-ready geometry each time a cad model is updated. Watch the Presentation


Light Matters: Systems Level Approach to HBLED illumination applications
Its good practice to apply a systems-level approach to high-brightness LED (HBLED) illumination applications. Minimally, the system includes the optical, thermal and electrical characteristics of the of the HBLED, the lens (if any) which is built-in to its package, secondary optics such as external plastic lenses/reflectors to direct the light as your application requires and power driver electronics. Read More


Design Engineers' Portal for Sensing and Machine Safety
Whatever industry you're in, or whatever product you manufacture, the right sensors to automate your plant, and to improve your overall efficiency, quality and safety are a must. You'll find Banner Engineering to be an amazing resource of products, training and people with expertise.

Design News Partner Zone Directory »

Please visit these other Reed Business sites