Skip navigation
Electronics Industry Search
Advertisement
RSS
Reprints/License
Print
Email

UK WEEE deadline delayed

Rob Spiegel -- Design News, January 10, 2006

The UK’s Department of Trade and Industry (DTI) announced last week the deadline for the European Union’s (EU) Waste Electrical and Electronic Equipment (WEEE) directive will delayed beyond its June 2006 deadline, which was already extended beyond the original January 2006 deadline. A new deadline has not been set, but it will almost certainly stretch well beyond the previous June 2006 target date.

Malcolm Wicks, the UK’s Energy Minister, said there will be a major review of the WEEE legislation that will consider the details of retailer take-back services and the development of a network of collection facilities where customers can take their WEEE-affected products. “We have listened to the concerns expressed by both the business community and other stakeholders over the implemented process and have decided that more time is needed to get the implementation right,” said Wicks.

Industry watchers noted that more time is needed because of concerns over he scale and the cost burden that will be placed on the local authorities that are required to dispose of WEEE materials that are collected separately from other refuge. The DTI already stated it will meet any costs to local authorities for arranging the treatment required for TVs and PC monitors that contain cathode ray tubes and fluorescent lamps that much be collected separately and sent to a hazardous waste landfill. The new review, however, will reconsider this area of responsibility.

The UK delay is expected to draw criticism from the European Commission that originally passed the WEEE directive. The commission announced last July that it would take legal action again a number of EU countries – include the UK – that have yet to enact the WEEE legislation into law. Anticipating condemnation from the European Commission, a DTI spokesperson said, “They are there to make sure the legislation is implemented on time, but in this instance, the decision was taken that we are simply not ready yet.”

Community groups in the UK asked for compensation because of the delay. One of the groups leading the demand for compensation, the Furniture Re-use Network, claimed that every additional month of delay in the WEEE implementation will require nearly $1 million in expenses from recycling groups. When WEEE is implemented, the producers of electronic products will take over the cost of recycling.

Advertisement

Sponsored Content

Technology Marketplace

RSS
Reprints/License
Print
Email
Find a supplier on oemsuppliersearch.com

Talkback
Advertisement
Reed Business Information Resource Center

Featured Company


Advertisement

Design News Partner Zones

Light Matters: The Unsung Heroes of Modern Health Care
First, let's define "no-compromise." In an ideal configuration, this lamp would use a high-brightness LED (HBLED) that is built into a small, integrated package and is able to produce a large quantity of focused light, operate with a high level of reliability and generate no audible noise. Is this difficult? Yes, but it is possible.
Read More


Design Engineers' Portal for Sensing and Machine Safety
Whatever industry you're in, or whatever product you manufacture, the right sensors to automate your plant, and to improve your overall efficiency, quality and safety are a must. You'll find Banner Engineering to be an amazing resource of products, training and people with expertise.


Test & Measurement World Machine Vision & Inspection Report
Topics include machine-vision software, Power over Camera Link, thermal imaging and frame grabbers. Read More

Design News Partner Zone Directory »

Please visit these other Reed Business sites